Laserfiche WebLink
Monitoring System Certification • 0/5 <br /> C <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 326.01 <br /> Complete the following checklist: <br /> I0 Yes ❑ No* Is the audible alarm operational? <br /> 2 Yes ❑ No* Is the visual alarm operational? <br /> • Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* if alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> 2 N/A operational? <br /> QYes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) 0 Sump/Trench Sensors; Q Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Q Yes; ❑No. <br /> QYes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operatingproperly? If so,at w'..at pe zc-t nf tank capacity does the alarm trigger? 90 % <br /> ❑ Yes* 21 No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all rep:.cement parts in Section E,below. <br /> DYes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> Q Product; ❑Water. If yes,describe causes in Section E,below. <br /> 2 Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> H Yes ❑ No* I is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> L2 Diesel 1 STP Sump Brine Sensor - 420 <br /> L4 Diesel 2 STP Sump Brine Sensor - 420 <br /> L6 Diesel 1 Fill Sump Brine Sensor - 420 <br /> L8 Diesel 2 Fill Sump Brine Sensor - 420 <br /> L11 Vent Sump Sensor - 208 <br /> L12 Vent Sump Brine Sensor - 420 <br /> L14 Dispenser 13 Brine Sensor - 420 <br /> L16 Dispenser 14 Brine Sensor - 420 <br /> L18 Dispenser 15 Brine Sensor - 420 <br /> L20 Dispenser 16 Brine Sensor - 420 <br /> L22 Dispenser 17 Brine Sensor - 420 <br /> L24 Dispenser 18 Brine Sensor - 420 <br /> - Some diesel was present in the turbine sumps. <br /> Removed. Need to find source of leaks. <br /> UN-036-2/4 Page 2 of 5 Rev.06/04/01 <br /> w .unidocs.org <br />