Laserfiche WebLink
. ' Monitoring System Certification • • �0� <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 327.04 <br /> Complete the following checklist: <br /> Q Yes ❑ No* Is the audible alarm operational? <br /> Q Yes ❑ No* Is the visual alarm operational? <br /> Q Yes ❑ No* Were all sensors visually inspected,functionally tested, and confirmed operational? <br /> Q Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> 0 N/A operational? <br /> ZYes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or .electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Q Sump/Trench Sensors; Z Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Z Yes; ❑No. <br /> ZYes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 20 % <br /> ❑ Yes* Q No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑Yes* Q No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> Q Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Q Yes ❑ No* I Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> L2 - 87 STP Brine Sensor - 420 <br /> L4 - 91 STP Brine Sensor - 420 <br /> L6 - Diesel STP Brine Sensor - 420 <br /> L8 - 87 Fill Brine Sensor - 420 <br /> L10 - 91 Fill Brine Sensor - 420 <br /> L12 - Diesel Fill Brine Sensor - 420 <br /> L16 - Vent Sump Brine Sensor - 420 <br /> L18 - Dispenser 1 / 2 Brine Sensor - 420 <br /> L20 - Dispenser 3 / 4 Brine Sensor - 420 <br /> L22 - Dispenser 5 / 6 Brine Sensor - 420 <br /> L24 - Dispenser 7 / 8 Brine Sensor - 420 <br /> L26 - Dispenser 9 / 10 Brine Sensor - 420 <br /> L28 - Dispenser 11 / 12 Brine Sensor - 420 <br /> UN-036-2/4 Page 2 of 5 Rev.06/04/01 <br /> w .unidocs.org <br />