My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:16 PM
Creation date
11/8/2018 9:53:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\COMPLIANCE INFO 2010 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2012
QuestysRecordDate
4/25/2018 3:57:18 PM
QuestysRecordID
3867065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ham ®® Y—b r A F•' I ,7!r 7 <br /> Return to Compliance for October 27, 2010 Inspection DEC 42010 <br /> BAN JOp.QL�v COUNTY <br /> Fast Lane Central Valley ENVIRC.'Nk LiNTAL <br /> pr <br /> 1. A payment plan was worked out with Accounting Department of the San Joaquin County <br /> Environmental Health Department.The first payment was made to the EHD in November. <br /> 2. Financial responsibility forms sent to site and submitted to EHD with this form. <br /> 3. UST Monitoring plan and response plan submitted with this form. Forms also sent to site. <br /> 4. The UST operating permit will be sent on completion of the payment plan to the EHD. However, <br /> we are able to continue operating legally as we have a payment plan to clear up the past due <br /> balance. <br /> 5. Monitoring certification, line leak detector, and spill bucket tests sent to site and delivered to <br /> EHD by site manager. <br /> 6. Diesel north fill sump sensor permit given and replaced by Service Station Systems (work <br /> ordered attached). <br /> 7. Release form attached. <br /> 8. Release form attached. Exact cause of the leak into the dispenser pans is not known at this time. <br /> Service Station Systems will determine cause of slow weeping from all dispenser shear valves <br /> and sumps as witnessed by the inspector.Should a cause be found it will be corrected and <br /> permit filed if required. Final certification of sites leak sensors on December 8, 2010 will ensure <br /> they can properly detect a release. <br /> 9. In order to help the Designated Operator report more completely each month the site will <br /> maintain a written log at the monitoring panel. On site manager will follow up to ensure DO has <br /> properly address the noted alarms during their monthly inspection. <br /> 10. Service Station System called to investigate the cause of the liquid in both the diesel STP sump <br /> and in the vent box. Initial investigation showed no cause of the liquid thus a more thorough <br /> investigation into a possible issue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.