My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:16 PM
Creation date
11/8/2018 9:53:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\COMPLIANCE INFO 2010 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2012
QuestysRecordDate
4/25/2018 3:57:18 PM
QuestysRecordID
3867065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sogov.org/ehd/unkiii.htmi <br /> CONTINUATION FORM Page: 4 of 4 <br /> FFICIAL IN PE TION REPORT Date: 11/22/10 <br /> Facility Address: Fast Lane Central Valley LLC 116 East Roth Road, Lathrop Program: UST <br /> SUMMARY OF VIOLATIONS <br /> CLASS I CLASS II,or MINOR-Notice to Com I <br /> Auto Side UST Inspection: Routine and Annual Monitoring System Certification. All Repeat Violations <br /> 23c. Designated operator(DO) failed to document all alarms and check if the alarms were responded to <br /> in the monthly visual inspection report. DO Julian Sherrod did not document the following alarms in his <br /> October 28, 2010 DO report: 1-4: 91 STP Brine fuel alarm on 10/01/10 at 11:52 AM and 9:29 AM; S4: 91 <br /> Prod Line Vacuum Warning on 10/01/10 at 10:30 AM, No Vacuum Alarm on 09/29/10 at 2:25 PM; S5: 91 <br /> Vent Line Vacuum Alarm on 10/01/10 at 9:26 AM, No vacuum alarm on 09/28/10 at 2:31 PM and <br /> 09/21/10 at 4:07 PM. <br /> DO Jessie Wadkins failed to document the S4: 91 Prod Line had No Vacuum Alarm on 02/17/10 at 8:45 <br /> AM on February 28, 2010 DO report. DO Greg Copp stated no work order found for the S5: 91 Vent Line <br /> No Vacuum alarm on 01/05/10 at 10:50 AM. There was no other corrective response action taken for <br /> this alarm. During the monthly inspection, the designated operator shall review the alarm history for the <br /> previous month, check that each alarm was documented and responded to appropriately, and attach a <br /> copy of the alarm history with documentation taken in response to any alarms to the monthly report. <br /> Ensure that designated operators performing monthly inspections at this facility are including all of the <br /> required information on the reports. <br /> 43. Approximately 2 cup of Diesel fuel was found at the bottom of the Diesel STP sump on both sides of <br /> the saddle and removed by technician. Approximately 1 inch of liquid was found in the vent box. All <br /> primary containment must be impervious to the liquid and vapor of the substance contained. <br /> Immediately discontinue use of failed piping and have a properly licensed, trained, and certified <br /> contractor replace or repair the failed piping under permit and inspection of the EHD. If the failed <br /> component can't be replaced immediately, there is a possibility that the diesel UST system may be red <br /> tagged to prevent fuel inputs. <br /> Submit to SJC EHD within 30 days (12/22/10): <br /> 1. one copy of the completed "Return to Compliance Certification" <br /> 2. a written corrective action statement for the above violations <br /> Notes: Designated Operator (DO) Julian Sherrod was not noted on the Owner Statement for DO. Submit <br /> within 30 days of when Julian performed his October 28, 2010 monthly report. <br /> - Siphon Jet Valve on 91 turbine changed out onsite due to high back pressure. <br /> -Technician unable to test 87, 91, Diesel Spill buckets (Auto side) today nor complete MSC testing from <br /> 10/27/10 (Truck side) for smart sensors (S1-S4). Immediately schedule to finish the MSC testing. <br /> Provide 48 hours notification to EHD. Follow up inspection will be charged at current hourly rate. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY T MEA HD'S CURRENT HOURLY RATE. <br /> EHD Inspect r: Receiv Tine: <br /> V <br /> CONTINUATION FORM <br /> EHD 23-02-003 Rev 08110/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.