My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:16 PM
Creation date
11/8/2018 9:53:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\COMPLIANCE INFO 2010 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2012
QuestysRecordDate
4/25/2018 3:57:18 PM
QuestysRecordID
3867065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONIT%3ING SYSTEM CERTIATION <br /> � <br /> CERTIFICATION / TEST DATE: December 28, 2009 <br /> Al. FACILITY A2. OWNER <br /> Name Fast Lane Lathrop Name Christina Gill <br /> Address 116 E. Roth Road, Lathrop, CA 95330 Address 111 Healdsburg Avenue, Healdsburg,CA 95448 <br /> Phone# 707-431-0541 Phone# 707-431.0541 <br /> Contact Christina Gill contact Christina Gill <br /> F. IN-TANK GAUGING I SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ■ Yes ❑ No" Has all input wiring been inspected for proper entry and termination,Including testing for ground faults? <br /> ■ Yes C3No` Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ■ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ■ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ■ Yes ❑ No' Were all probes reinstalled properly? <br /> ■ Yes ❑ No Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No For equipment start-up or annual equipment certification,was a leak simulated to verity LLD performance? <br /> ❑ NIA (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ❑ Yes ■ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ■ Yes ❑ No' For mechanical LLDs,does the LLD restrict product now if It detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off If the LLD detects a leak? <br /> ■ NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ■ NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ■ NIA or falls a test? <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> ■ NIA <br /> ■ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> The Diesel MLLD was not tested due to tank being low on fuel.The product line would not build pressure. <br /> The MLLD will need to be retested when tank has been filled. <br /> 2006 Walton Engineering,Inc. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.