Laserfiche WebLink
MONITWING SYSTEM CERTIWATION <br /> CERTIFICATION / TEST DATE: December 28, 2009 <br /> Al. FACILITY A2. OWNER <br /> Name Fast Lane Lathrop Name Christina Gill <br /> Address 116 E. Roth Road, Lathrop,CA 95330 Address 111 Healdsburg Avenue, Healdsburg, CA 95448 <br /> Phone# 707-431-0541 Phone# 707-431-0541 <br /> Contact Christina Gill Contact Christina Gill <br /> I. RESULTS OF VACUUM/PRESSURE MONITORING EQUIPMENT TESTING <br /> Make I Model of Monitoring System: Veeder-Root TLS-350 <br /> System Type: ❑ Pressure ■ Vacuum. <br /> SensorlD <br /> Component(s)Monitored by this sensor: s1:87Prod Line <br /> Sensor Functionality Test Result: 5 Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Components)Monitored by this Sensor: s2: 87 Vent Line <br /> Sensor Functionality Test Result: 5 Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: s3: 87 Vapor <br /> Sensor Functionality Test Result: 5 Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: s4: 91 Product Line <br /> Sensor Functionality Test Result: 5 Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Components)Monitored by this Sensor: s6:Vent Line <br /> Sensor Functionality Test Result: 5 Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: s7: Diesel Vent <br /> Sensor Functionality Test Result: 5 Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Results: ❑ Pass; ❑ Fail <br /> How was interstitial communication verified? <br /> ❑ Leak Introduced at Far End of Interstitial Space:, ❑ Gauge: ❑ Visual Inspection: ❑ other(Descdbe in sec.J,below) <br /> Vacuum was restored to operating levels in all interstitial spaces: ■ Yes ❑ No(K no,describe in Sac J,below) <br /> J. COMMENTS <br /> Also tested were the Brine Sensors in UDC's and Tank Sumps. <br /> 1-2: 87 STP Brine L22:Disp 5-6 Pan <br /> 1-4: 91 STP Brine L24:Disp 7-8 Pan <br /> 1-6: Diesel STP Brine L26:Disp 9-10 Pan <br /> 1-8: 87 Fill Brine L28:Disp 11-12 Brine <br /> L10:91 Fill Brine <br /> L12:Diesel Fill Brine <br /> L16:Vent Sump Brine <br /> L18:Disp 1-2 Pan <br /> L20:Disp 1-2 Brine <br /> 11 If the sensor successfully dee s a simulatW vawumlpreewre leak intro]ucetl in tM1e imerslitlel spec al tM1e funneA pmnt from the sensof vawum/Ma ure has Leen demanslrated ION wmmunlcating ihmughOut the interslice. <br /> ©2008 Walton Engineering,Inc. <br /> Page 3a of 3 <br />