Laserfiche WebLink
- OPW 61SO OVERFILL PREVENTION VALVES <br /> The DPW 61SO Overfill Prevention Valve is designed to prevent the overfill of underground <br /> w' storage tanks by providing a positive shut-off of product delivery.The shut-off valve is an integral <br /> part of the drop tube used for gravity filling.The DPW 61SO allows easy installation(without <br /> breaking concrete)and requires no special manholes. <br /> The DPW 61 SO is a two-stage shut-off valve.When the liquid level rises to about 95%of tank <br /> capacity,the valve mechanism is released,closing automatically with the flow.This reduces the <br /> flow rate to approximately 5 gpm through a bypass valve.The operator may then stop the filling <br /> process and disconnect and drain the delivery hose.As long as the liquid exceeds the 95%level, <br /> the valve will close automatically each time delivery is attempted. <br /> If the delivery is not stopped and the liquid rises to about 98%of tank capacity,the bypass <br /> valve closes completely. No additional liquid can flow into the tank until the level drops below a <br /> reset point. <br /> Models of the 61 SO are available to meet virtually any UST application including two-point, <br /> coaxial, poppeted coaxial and remote fill.The 61SO-3000 provides two-point overfill protection for <br /> 3"riser pipes,and the 61 SO-1000 and 61SO-100C(CARB)feature a grooved-tube design for use <br /> with tank gauging systems. Methanol and CARB(vapor-tight)approved models are also available. <br /> The DPW 61 SO is approved by the New York City Fire Department.(Approval#4902) <br /> • IMPORTANT <br /> In order to prevent product spillage from the Underground Storage Tank(UST),properly maintained delivery equipment and a proper <br /> connection at the fight-fill adaptor are essential. Delivery personnel should be managed and trained to inspect delivery elbows and <br /> hoses for damaged and missing parts.They should always make certain there is a positive connection between the adaptor and <br /> elbow. If delivery equipment is not property maintained,or the elbow is not securely coupled to the adaptor,a serious spill may result <br /> when the DPW 61SO closes, causing a hazard and environmental contamination. <br /> NOTE: The DPW 61SO is designed for use on tight-fill gravity drop applications only. Do not use for pressure fill applications. <br /> Features: <br /> ♦Simple, Easy and Quick Installation- ♦ No Pressurization of The Tank- Certifications NY City Fire <br /> ' No excavation or special manholes Operates directly from liquid level. and Listings CARB Department <br /> required. ♦Will Accept a Dipstick for Gauging. 61SO Series Initial Approval <br /> ♦Economical-Costs a fraction of ♦ Retrofits Directly For both new and Certification #4902 <br /> expensive,complicated and difficult existing tanks with 3"or 4"fill risers. Letter Oct 88 <br /> to install valves. ♦Quick Drain Feature-Automatically updated approval <br /> ♦ Furnished Complete-Supplied with drains hose when head pressure is Loner#97.04 <br /> new upper and lower drop tubes, relieved. 61SOM Approval <br /> mounting hardware and thorough gest Flow Rate in The IndustUtter#90-5 <br /> ry.• <br /> _ instructions for quick job site time. 61sop Approval <br /> ♦Completely Automatic Operation-No Letter#92-8 <br /> prechecks to perform,no resets,and no "Test witnessed by Bowser-Momen Inc.,an <br /> overrides to be broken or abused. independent laboratory.Results available <br /> upon request. <br /> Advantages of Overfill Prevention Materials <br /> Compared to Overfill Warning Systems: Valve body: cast aluminum <br /> ♦Completely Automatic Operation- ♦Speeds Delivery Operations- Float: nitrile rubber, closed cell foam <br /> Does not rely on the alertness or speed Product flows unimpeded into the tank Valve:aluminum <br /> of response of the delivery attendant, until the hose"kick"that accompanies Seals:viton <br /> for certainty of overfill prevention. the valve shut-off provides a clear Upper&lower Drop Tube: aluminum <br /> ♦Keeps the Top of UST"Dry,"per signal that the liquid has reached the Plastic parts:acetal <br /> EPA Requirements-Eliminating shut-off level. Hardware:stainless steel <br /> possible leaks at loose bung fittings ♦Simple and Inexpensive Installation- <br /> and the need for double containment In both two-point and coaxial fill <br /> on vent lines. applications,no additional excavation, <br /> ♦Does Not Rely on Pressure in the manholes or vent piping are required. <br /> UST to Stop Flow-Allowing faster fill <br /> times and reducing spill risk. <br />