Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PROGRAM 4.0 <br /> <br />Final Environmental Impact Report – Lathrop Pilot Flying J 4.0-11 <br /> <br />ENVIRONMENTAL IMPACT MITIGATION MEASURE MONITORING <br />RESPONSIBILITY TIMING VERIFICATION <br />(DATE/INITIALS) Department UTILITIES Impact 3.13-2: The proposed project has the potential to result in a determination by the wastewater treatment and/or collection provider which serves or may serve the project that is does not have adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments <br />Mitigation Measure 3.13-1: Prior to occupancy of any building that would <br />require wastewater treatment services, the project proponent shall secure <br />adequate wastewater treatment allocation through the City’s allocation <br />process. Additionally, the project proponent would be required to <br />install/connect the necessary collection/transmission infrastructure to <br />ensure the appropriate treatment of all wastewater (per Chapter 13.16.190 <br />of the Lathrop Municipal Code), as determined by the City of Lathrop. <br />City of Lathrop Community Development Department and the City of Lathrop Public Works Department <br />Prior to occupancy of any building