Laserfiche WebLink
1/1 /2005 09:01 2094683433 EHD PAGE 05 <br /> • 0 <br /> SAMPLING PROTOCOL FOR ROUTINE PIPING/DISPENSER REMOVALIREPLACEMENT <br /> Th . following represents minimum sampling criterion required for closure compliance. Soil samples collected shell be <br /> re sentative of native tolls beneath the tank's Invert (tank's bottom) at a collection depth not to exceed 2 • 4 feet. If <br /> co tamination is documented during closure, an unauthorized Release Notification must be completed and submitted within <br /> 6v (5) working days pursuant to California Health& Safety Code, Section 25295. <br /> DISPENSER SAMPLES <br /> AT LEAST ONE SAMPLE BELOW EACH DISPENSER <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> DISPENSER& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> 9 <br />