My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1113
>
2300 - Underground Storage Tank Program
>
PR0231728
>
COMPLIANCE INFO 1987-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 2:54:34 PM
Creation date
11/8/2018 9:53:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2015
RECORD_ID
PR0231728
PE
2361
FACILITY_ID
FA0003565
FACILITY_NAME
UNIVERSAL SWEEPINGS SERVICES
STREET_NUMBER
1113
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
14327042
CURRENT_STATUS
02
SITE_LOCATION
1113 SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\S\SHAW\1113\PR0231728\COMPLIANCE INFO 1987-2015.PDF
QuestysFileName
COMPLIANCE INFO 1987-2015
QuestysRecordDate
5/31/2017 3:41:00 PM
QuestysRecordID
3403671
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Edition:June 1999 <br /> Campo/Miller, Inc. <br /> LS300-120 and LS300-120 XLC <br /> AUTOMATIC ELECTRONIC LINE LEAK DETECTOR <br /> Certification: Leak rate of 3 gph with Po=96.2% and PFA=0%. <br /> Leak Threshold: 2.36 gph. A system should not be declared tight if the test result indicates a loss that <br /> equals or exceeds this threshold. <br /> Applicability: Gasoline, diesel, aviation fuels,fuel oils#4 and#6,waste oil, kerosene, and solvents. <br /> Specification: System tests pressurized fiberglass and steel pipelines. <br /> Tests are conducted at operating pressure. <br /> Pipeline Capacity: Maximum of 35.36 gallons. <br /> Waiting Time: None between delivery and testing. <br /> None between dispensing and testing. <br /> Test Period: Response time is 10 seconds, but can be adjusted between 10 seconds and 2 <br /> minutes, 30 seconds depending on the bulk modulus'of the piping system. <br /> Test data are acquired and recorded by a microprocessor. <br /> `See glossary. <br /> System Features: Permanent installation on pipeline. <br /> Automatic testing of pipeline. <br /> Preset leak threshold. <br /> Single test to determine if pipeline is leaking. <br /> Dispenser shutdown, Adicator light and alarm activation if leak is declared. <br /> Calibration: Manufacturer recommends a weekly self check, activated by the operator, and a full <br /> functional test every 30 days, estimated to take 5 minutes to perform. <br /> Campo/Miller, Inc. Evaluator: Jetronix Engineering Laboratories <br /> P. O. Box 1809 Tel: (213)377-4668 <br /> Porterviile, CA 93258 Rev. by Ken Wilcox Associates <br /> Tel: (559)781-6862 Tel: (816)443-2494 <br /> Date of Evaluation: 06/01/91, Rev. 09/09/94 <br /> 44 <br /> Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of <br /> the method or equipment. Equipment should be installed and operated in accordance with all applicable laws and regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.