My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1113
>
2300 - Underground Storage Tank Program
>
PR0231728
>
COMPLIANCE INFO 1987-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 2:54:34 PM
Creation date
11/8/2018 9:53:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2015
RECORD_ID
PR0231728
PE
2361
FACILITY_ID
FA0003565
FACILITY_NAME
UNIVERSAL SWEEPINGS SERVICES
STREET_NUMBER
1113
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
14327042
CURRENT_STATUS
02
SITE_LOCATION
1113 SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\S\SHAW\1113\PR0231728\COMPLIANCE INFO 1987-2015.PDF
QuestysFileName
COMPLIANCE INFO 1987-2015
QuestysRecordDate
5/31/2017 3:41:00 PM
QuestysRecordID
3403671
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S 2095327320 08/23/02 21 18 P.03 <br /> • • <br /> Facility Name: Universal Sweeping Services (Page 3) <br /> In-Tank Gauging I SIR Equipment: <br /> []Check this box if tank gauging is used only for inventory control. <br /> ®Check this box if no tank gauging or SIR equipment is installed and disregard the following section. <br /> Com tete ther ollowin checklist: <br /> ❑Yes ❑ No" ILas all input wiring been inspected for proper entry and termination, including tenting for ground faults'? <br /> ❑Yes ❑ No' Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> El Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑Yes ❑ No" Was accuracy of system water level readings tested? <br /> ❑yes ❑ No' Were all probes reinstalled properly? <br /> []Yes El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In the See Ion H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): <br /> ❑ Check this box if I.LD9 are not installed and disregard the following section. <br /> ®Yes [] No* for equipment start-up or annual equipment certification, was a leak simuulated th verify LLD performance? <br /> ❑ MA ((:heck all that apply) Simulated leak rate: ® 3 g p CIO.' g•p' g'p' <br /> ❑Yes ® No' Were all LI,Ds confirmed operational and accurate within regulatory requirements'? <br /> ®Yes ❑ No' Was the testing apparatus properly calibrated'? <br /> []Yes [] No* for mechanical LI.Ds, does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> Yes No' I;or electronic I.I.Ds,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A onion of the monitoring system is disabled <br /> ❑Yes ® No' For electronic LLDs, does the turbine automatically shut otf if any p <br /> ❑ N/A or disconnected? <br /> ❑Yes ® No* For electronic LL Ds, does the turbine automatically shut off if any portion of the manitnring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®yes ❑ <br /> No* For electronic LLDs,have all accessible wiring connections been visually inspected'? <br /> N/A <br /> ®yes []No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Campo-Miller line leak detectors are installed in this system for both the Gasoline and <br /> Diesel products. Neither will detect a leak of 3 GPH/ 10 psi. The alarm only sounds when the line <br /> pressure actually reaches zero, and then not with any regularity. We allowed the Diesel line to run for <br /> eight minutes with a calibrated leak of 3 gph/ 10 psi and it never did shut off the turbine. The gasoline <br /> unit was in a state of alarm upon arrival and had to he reset to operate the dispenser for the test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.