Laserfiche WebLink
..u�aum mg Nysfeul C.erulrcatron • • <br /> Facility Name: Bob Cat Central_ JJICol icsung,ocrc;,.tng: / 9 /01 <br /> F. In-Tank Gauging Equipment: ❑ Check this box if tank gauging is used only for inv ntory control. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection mon tori ng. <br /> Software Version Installed: <br /> Com tete the folio ing checklist- N/A <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product/waste level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all alarms activated and did they function properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed. <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Cing checklist <br /> ® Yes ❑ No* Was a leak simulated to verify LLD performance?(Check all that apply) <br /> Simulated leak rate: ❑ 3 g.p.h.; El0.1 g.p.h.; El0.2 g.p.h. <br /> ❑ Yes 9 No* Were all LLDs confumed operational and accurate within regulatory requirements? <br /> W Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 54 N/A <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> W Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> W Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ® Yes 01 No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> C3 N/A <br /> W Yes ❑ No* If necessary to proper equipment operation,are fuel filters in good'condition? <br /> ❑ N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Campo Miller LS 300 plus line leak detector inop on diesel <br /> line. — <br /> CALNI-01 <br /> Page 3 06a3r99 <br />