My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1113
>
2300 - Underground Storage Tank Program
>
PR0231728
>
COMPLIANCE INFO 1987-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 2:54:34 PM
Creation date
11/8/2018 9:53:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2015
RECORD_ID
PR0231728
PE
2361
FACILITY_ID
FA0003565
FACILITY_NAME
UNIVERSAL SWEEPINGS SERVICES
STREET_NUMBER
1113
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
14327042
CURRENT_STATUS
02
SITE_LOCATION
1113 SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\S\SHAW\1113\PR0231728\COMPLIANCE INFO 1987-2015.PDF
QuestysFileName
COMPLIANCE INFO 1987-2015
QuestysRecordDate
5/31/2017 3:41:00 PM
QuestysRecordID
3403671
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
instructions *- eyuipmeut testing at*(_ ertâ–ºtteation <br /> General Instructions <br /> I. Equipment that monitors underground storage tank systems containing hazardous materials must be to ted/servicctl <br /> annually, or on a schedule specified by the manufacturer, whichever is more-frequent. <br /> 2. This certification form must be used to document the following activities: l.) Periodic testing as desc ibed above: <br /> 2.) Testing of new monitoring systems upon installation; 3.) Testing of replacement sensors, prof es, or other <br /> system components; and 4.)Testing of repaired sensors, probes,-or other system components. <br /> 3. As noted on Page 1, a separate certification form must be competed for each individual monitoring sy tem control <br /> panel. For example: If one control panel monitors in-tank gauging probes and another panel monitors el ctronic line <br /> leak detectors, two certification forms would be required. <br /> 4. Be aware that many local agencies require that a permit be obtained prior to installing new monitoring systems or <br /> components. Check with your local agency for their requirements before starting work. <br /> Section B <br /> 1. In the Tank ID sections, describe which tanks you worked on (e.g. Diesel Tank, North Tank, Middle Tank). <br /> 2. For compartmented tanks, list each compartment as a separate tank. <br /> 3. Where "Model" is asked for, the name of the manufacturer and the manufacturers specific model name o number, as <br /> referenced in the "List of Leak Detection Equipment and Methods for Underground Storage Tanks" ( .e. LG-113) <br /> must be specified. <br /> 4. Hands-on functional testing of individual leak detection components to confirm operability tom ufacturer's <br /> specifications and state regulations is required. This includes verifying any automatic shut-off features.1 In the case <br /> of sensors that can not be non-destructively tested, contact your local agency that regulates UST systems to see if <br /> they will approve alternate testing methods(e.g. testing of representative samples). <br /> Section C <br /> 1. Certification must be made by a state-registered technician. <br /> 2. All work associated with testing/servicing of equipment must be performed by or under the direct superrision of the <br /> certifying technician. <br /> Section D <br /> 1. Leak sensors must be reinstalled at the low points of the secondary containment systems they monitor and positioned <br /> so that other equipment will not interfere with their proper operation. <br /> 2. When testing operability of positive turbine shut-down. you must: l.) verify shut-down by simulating aleak; and 2.) <br /> verify shut-down by disconnecting the sensor. <br /> Site Plan <br /> You must attach a Site Plan showing the general layout of tanks and piping. Clearly identify locations of the following <br /> equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumf s, dispenser <br /> pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank <br /> liquid level probes (if used for leak detection). Note the date the Site Plan was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.