My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2014 REMOVAL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
19107
>
2300 - Underground Storage Tank Program
>
PR0539625
>
REMOVAL_2014 REMOVAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:39 AM
Creation date
11/8/2018 9:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2014 REMOVAL
RECORD_ID
PR0539625
PE
2361
FACILITY_ID
FA0022676
FACILITY_NAME
CALTRANS
STREET_NUMBER
19107
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
19107 E HWY 26
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\HWY 26\19107\PR0539625\2014 REMOVAL.PDF
QuestysFileName
2014 REMOVAL
QuestysRecordDate
7/14/2017 3:08:20 PM
QuestysRecordID
3506712
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br /> 6. <br /> IV. <br /> 1.0 IN RODUCTION <br /> 6. This Health and Safety Plan (HSP) is a compilation of health and safety guidelines, policies and/or <br /> performance protocols that, when exercised, are intended to reduce or eliminate the potential for injury <br /> and exposure during the performance of the acth ities at the site described below. Conformance with its <br /> 6. contents does not warrant that injuries or exposin es will not occur. <br /> ` This HSP is not a training tool and does not contain the degree of detail necessary to train an employee <br /> on the appropriate performance, approach and/or equipment-use protocols referenced, herein. Persons <br /> working on this project and referring to this FISP shall meet the minimum training requirements <br /> ` described in Section 2.2. <br /> This HSP has been prepared to specifically support the field activities described herein. The provisions <br /> described herein apply to employees of Geo on Consultants, Inc. and its subcontractors, only. <br /> Representatives of the Client, Client-retained subcontractors, and representatives of state or local <br /> government agencies are expected to observe fie safety rules and requirements established by their <br /> respective organizations, provided they do not donflict with this HSP. However, Geocon will not be <br /> responsible for enforcing the conditions of this BSP on these representatives. <br /> The contents of this HSP are based on factors a d conditions understood prior to the start of the field <br /> ., activities. If those factors and conditions change during the performance of the activities, including the <br /> service scope, or if conditions exist that were not considered in the preparation of this HSP, then such <br /> shall be brought to the immediate attention of the person approving this HSP, and the HSP shall be <br /> modified,accordingly. The date indicated in Secl ion 8.0 of this document indicates the latest version of <br /> this HSP. <br /> 6. <br /> All project personnel, including Caltrans field ispectors will review, and become familiar with the <br /> elements of the Plan prior to site work. A copy f the Plan will be provided to all subcontractors and <br /> ` the Caltrans Resident Engineer(RE), Project(Task Order)Manager, or designee involved with project <br /> activities. <br /> 6. <br /> A pre job conference will be held to delineate ioles and responsibilities, discuss key elements of the <br /> Plan, and coordinate activities. This Plan is a "working document" to be used by affected personnel. <br /> �- The Plan may be modified at any time in accordance with Section 1.4 to adequately address changing <br /> conditions or previously unrecognized exposure iazards which may be encountered during the project. <br /> An updated, current copy of the Plan will be maintained at the project site during and be available to all <br /> affected personnel. <br /> 6. This Plan expires 6 months from the date of CIFI approval unless updated or amended; ref. T8 CCR <br /> §1532.1(e)(2XE)"Written programs shall be revised and updated at least every 6 months..." <br /> L <br /> Linden UST SI and Removal,Task Order No.34 Caltrans Contract 06AI895,EFIS 10-1300-0181-0 <br /> LGeocon Project No.S9800-01-34 1 - October 2013,Revised September 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.