Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> CoApletr the following checklist: <br /> ❑ No* Is the audible alarm operational? <br /> ❑ No* Is the visual alarm operational? <br /> El Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> es <br /> not interfere with their proper operation? <br /> ❑ es ❑ o* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> / & N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine au matically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to opera or is electrically disconnected? If yes <br /> - ich sensors initiate <br /> ,positive shut down? (Check all that apply) Sump/Trench Sensors; El Dispenser ntSensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? U Yes; ❑No. <br /> ❑ Yes VNI <br /> * or tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill int(s)and operating ro rl ? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ s* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the mapdacturer name and model for all replacement parts in Section E,below. <br /> 16 Yes* ❑ No Was liquid f nd inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; Water. If yes,describe causes in Section E,below. <br /> ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring ui mentoperational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: inw><! 1 .C, A <br /> Page 2 of 3 03101 <br />