Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: W 16eck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com Tete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs e not installed. <br /> Co Tete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment rtification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: Q1 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es ❑ No* Was the testing apparatus properly calibrated? <br /> Ef Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ o* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 40 N/A <br /> ❑ Yes El No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ld N/A or disconnected? <br /> ❑ Yes ❑,Pdo* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> P N/A or fails a test? <br /> ❑ Y <br /> sLJ For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> laN/A <br /> Ye ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or rill be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />