Laserfiche WebLink
Page 0 of 1 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum M Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution: .0007" <br /> Sump# Sump# r 9 Sump# A7 Sump# <br /> Sump Diameter: II/Ir" 5l " <br /> Sump Depth: 72 172-" 7z" „ <br /> Sump Material: kl�4 11 <br /> Height from Tank Top to Top of 0 „ <br /> Highest Piping Penetration: 13 I /Y <br /> Height from Tank Top to Lowest „ <br /> Electrical Penetration: Z(4 2 6 2 9 <br /> Condition of sump prior to testing: CZ.A. e HIGHEST <br /> Portion of Sump Tested' PIPING HIGHESTVE HABOVE <br /> PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> product and water)?* <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressurelvacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: 9:/11 //.' z 7 /2:57 <br /> Initial Reading(Rt): 9.&CTC /L J/093 S <br /> Test End Time: 9:33 ”. '/Z <br /> Final Reading(RF): E//3.3 A0.7Y10 11-09'730 <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change inReading(RFR,): , coo417 -cepy/ <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Test Result: . ® Pass.. ❑Fail ®. Pass ❑:Fail (..Pass ❑ Fail ❑. Pass El Fail <br /> Was sensor removed for testing? W Yes ❑No ❑NA ®Yes ❑No ❑NA U Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ®Yes ❑No ❑NA ®Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Chevron#98264 <br /> 3775 N. Tracey Blvd. <br /> Tracey, CA 95376 <br /> N05207-SB 989 Testing <br />