Laserfiche WebLink
ctu.IN <br />• • <br />• <br />14-Pg if) ... <br />San Joaquin County <br />Environmental Health Department <br />1868 E Hazelton Avenue <br />Stockton, California 95205 <br />VVebsite: www.sjcehd.com <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />DIRECTOR <br />Linda Turkatte, REF-IS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Rodney Estrada, REHS <br />Willy Ng, REHS <br />Pete Tobin, Senior Project Manager <br />Barghausen Consulting Engineering, Inc. <br />915 Highland Pointe Drive <br />Roseville, CA 95678 <br />ARCO AM/PM, 10715 Trinity Parkway, Stockton, CA 95219 SR0075823 <br />The permit application to install an underground storage tank (UST), system at the above address was <br />received by the Environmental Health Department on September 20, 2016. Please provide the following <br />additional underground tank system information. <br />1. The installing technician's certifications. At least one person shall have ICC and Manufacturer <br />certifications on site during installation. Certifications needed: ICC UST Installer / Retrofit, ICC <br />Service Technician, NOV Pipe and Penetration Fitting, Bravo Sump and Penetration Fitting, <br />Veeder Root TLS-350, OPW Spill Bucket, Flex-ing Pipe, Hose Master Pipe, Xerxes Tank. <br />2. Explain how communication can be demonstrated throughout the VPH monitored interstitial <br />spaces of the vent line transition sump, under dispenser containment (UDC) sumps, tank top <br />sumps, vacuum-monitored lines. Vacuum or hydrostatic liquid communication must be <br />demonstrated at the far ends of all interstitial spaces. The end of the piping vacuum zone under <br />each UDC must be tested. Each double-walled hydrostatic sump must be tested throughout the <br />sump. Include a description or drawing of any test ports used to test communication. <br />3. Submit a drawing of the vacuum monitored piping interstitial spaces and label each zone with the <br />corresponding vacuum sensor. <br />4. Provide cut sheets for the fill tank-top sump lids. The plan lists OPW parts. The provided cut <br />sheet is for Bravo lids. <br />5. The Bravo sump lid cut sheet is part # B401. This number does not match the plans or the <br />application which list B421 and B481. <br />6. Provide cut sheets for the OPW spill buckets. The plan lists OPW spill buckets. The provided cut <br />sheet is for Phil-Tite spill buckets. <br />7. Provide an ELD work plan and identify the ELD testing company. <br />8. The application and plans list NOV Fiberglass Systems pipe. Please add the model / brand. Red <br />Thread IIA? <br />9. To the application please add the manufacturer and brand/model of tank and piping. See the <br />enclosed highlighted application. <br />If you have any questions, please contact me at gbackussjcehd.com or 209-468-2986. <br />Garrett Backus, Lead Senior REHS <br />Protecting Your Health-One Inspection at a Time