My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRC$,January 2002 Page 7 of 7 <br /> 4.TANK ANNULAR TESTING <br /> Test Method Developed 13y: ©Tank Manufacturer ®Industry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Uses: O Pressure ®Vacuum ©hydrostatic <br /> 0 Other(Specify) <br /> Test ui ent Used:0 TO 30"HG.GLYCERIN FILLED VACCUM GUAGES Equipment Resolution:0.1"HG. <br /> Tank#1 Tank# Tank# Tank# <br /> Is tank Exempt From Testing?' NO <br /> Tank Cupac44,000 GAL. <br /> Tank Material: FIBERGLASS <br /> Tank Manufacturer. OWENS CORNING <br /> Product Stored: DIESEL <br /> Wait time between applying <br /> pressurelvacuumfwater and starting F 30 MIN. <br /> test: <br /> Test Start Time: 11.00 AM <br /> Initial Reading(Rt): 10" HG. <br /> Test End Time: 12:00 PM <br /> Final Reading(R F): 10"HG. <br /> Test Duration: 1 HOUR <br /> Change in Reading(RF-Rt): 0 <br /> PasslF'ail'rhreshold or Criteria: 0 <br /> Teat Result: PASS <br /> Was sensor removed for testing? NA <br /> Was sensor property replaced and NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to lesiing, and recommended follow•-up for failed tesis) <br /> 'Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. (California Code of Regulations,Title 23,Section 2637(a)(6)) <br /> Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.