My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SV4RCB,January 2002 Page 3 of 7 <br /> 5,SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> �— ❑thher(Sped) <br /> Test Method Uses: ®Pressure 0 vacuum ❑Hydrostatic <br /> ❑Other(S Cr! <br /> Test I; ui ment Used:0 TO 15 PSI GLYERIN FILLED PRESSURE GUAGES Equipment Resolution:6.1 PSI <br /> Piping Rua M SUPPLY 1 Piping Rim N SUPPLY 2 Piping Run k RETURN Piping icon <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: SMITH SMITH SMITH <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 40' 40' 40' <br /> Product Stored: DIESEL DIESEL DIESEL <br /> Metliod and location of CLAM SHELL CLAM SHELL CLAM SHELL <br /> piping.-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 MIN. 30 MIN. 30 MIN. <br /> starting test: <br /> Test Start Time: 10:00 AM 10:00 AM 10:00 AM <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 11:00 AM 11:00 AM 11:00 AM <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I HOUR 1 HOUR I HOUR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 <br /> Test Result: PASS PASS PASS <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for{ailed tests) <br /> Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.