Laserfiche WebLink
130312-737 <br /> F. In-Tank Gauging 1 SIR Equipment; A Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the Ioil owl ng checklist: <br /> x Yes Q No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> r Yes No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> x Yes Ej No' Was accuracy of system product level readings tested? <br /> r Yes No' Was accuracy of system water level readings tested? <br /> x Yes No' Were all probes reinstalled properly? <br /> Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): x Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> ❑ NIA that apply) Simulated leak rate: ❑3 g.p.h.; E10.1 g.p.h; ©0.2 g.p.h. <br /> ❑ Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No' Was the testing apparatus properly calibrated? <br /> Yes No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> NIA <br /> ❑ Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ NIA disconnected? <br /> ❑ Yes B No` For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> ® Yes No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> El NIA <br /> ❑ Yes ❑ No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2121/07 <br />