My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW `we <br /> Site Address: 2500 W. Turner Rd. Date of Testing/Servicing: 5 / 17 / 12 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: NIA <br /> Complete the following checklist: <br /> • Yes ❑ No* Is the audible alarm operational? <br /> • Yes ❑ No* Is the visual alarm operational? <br /> • Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> • Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> 0 NIA monitoring system detects a leak,fails to operate,or is electrically disconnected?if yes:which sensors initiate <br /> positive shut-down?(Check all that apply) ❑ Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> • Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> ❑ N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill <br /> point(s)and operating properly?If so,at what percent of tank capacity does the alarm trigger?90% <br /> ❑ Yes* ® No Was any monitoring equipment replaced?If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> • Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> ❑Product; U Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comment <br /> This tank has two turbines that feed day tank.Mopped out small amount of water from sump. <br /> Page 2 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.