Laserfiche WebLink
140721-003 <br /> D. Results of TestinglServicing <br /> Software Version Installed: n a _ <br /> Com fete the followi checklist: <br /> A Yes ❑ No' Is the audible alarm operational? <br /> u Yes U No' is the visual alarm operational? <br /> x Yes U No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> u Yes No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> x Yes No' 1 alarms are relayed to a remote monitoring station,is all communications equipment te.g.modem)operational? <br /> N/A <br /> Yes [] No' For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> i NIA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> 0 Sump/Trench Sensors; 3 Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? Yes;flNo. <br /> Yes 13 No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> ii NIA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? if so,at what percent <br /> of tank capacity does the alarm trigger? % <br /> Yes` it No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> Yes' 9 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)©Product; p Water. If <br /> s,describe causes in Section E,below. <br /> x Yes No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> * Yes No' Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Replaced #3 sump sensor per inspector write up tested and witnessed b <br /> inspector for operation and placement. <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2121107 <br />