My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140721-003 <br /> F. In-Tank Gauging 1 SIR Equipment: W Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if no tank gauging or Slit equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> H Yes ❑ No' Has all input wiring been inspected for proper entry and Termination,including testing for ground faults? <br /> N Yes © No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> W Yes ❑ No' Was accuracy of system product level readings tested? <br /> a Yes No" Was accuracy of system water level readings tested? <br /> R Yes No" Were all probes reinstalled properly? <br /> Yes ❑ No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): io Check this box if LLDs are not installed. <br /> Complete the follow ng checklist: <br /> [] Yes ❑ No" For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Cha(*all <br /> ❑ NIA that apply) Simulated leak rate: 03 g.p.h.; 00.1 g.p.h; 00.2g.p.h. <br /> Yes No' Were all LCDs confirmed operational and accurate within regulatory requirements? <br /> [] Yes ❑ No' Was the testing apparatus properly calibrated? <br /> Yes No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> NIA <br /> Yes No` For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> NIA <br /> ❑ Yes No' For electronic LLDs, does the turbine automatically shut off it any portion of the monitoring system is disabled or <br /> NIA disconnected? <br /> 0 Yes No" For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> NIA fails a test? <br /> © Yes No' For electronic LLDs,have ail accessible wiring connections been visually inspected? <br /> N/A <br /> Yes ® No' Were all items on the equipment manufacturer's maintenance cheddist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.