Laserfiche WebLink
FUEL MANAGEMENT SYSTEMS <br /> �Franklin Fueling Systems I LINE LEAK DETECTION <br /> 1 <br /> TS- LS500 <br /> AutoearnLTM <br /> Electronic Line <br /> Leak Detection <br /> INCONTA°brand TS-LS500 AutoLearnTm electronic line leak detection <br /> (ELLD) learns the characteristics of each line,eliminating possible <br /> configuration errors and ensures unparalleled leak detection <br /> accuracy. It is an optional feature of T5 Series fuel management <br /> systems.The TS-LS500 Autol earnTm ELLD system includes a statistical <br /> line leak detection (SLLD) feature which can be activated at high <br /> throughput sites that cannot accommodate the prolonged <br /> downtime necessary for static line leak detection testing. <br /> Highlights Specifications <br /> • Automatically learns exact pipeline characteristics. • Dimensions:6'/<'x 2"NPT <br /> • No pipe type and length programming required. •Operating temperature:-401 to 149°F (-401 to 66°C) <br /> •Monitors flexible,steel and/or fiberglass pipelines in •Operating pressure:0 to 100 psi (0 to 689 kPa) <br /> any combination up to certified maximum values. . Belden'"cable: #9363-22 AWG, #9364-20 AWG or <br /> •Works with submersible pumps generating 25 psi or #9365-18 AWG <br /> more. <br /> •Maximum sensor to console cable distance:500' (152.4 m) <br /> •Automatically performs 3.0 gph,0.2 gph and 0.1 gph <br /> line tests,as well as other line pressure checks. •Sensor port fitting:2"female NPT <br /> • Includes the industry's only statistical line leak •Sensor material:Anodized aluminum body and stainless <br /> detection (SLLD). steel sensor <br /> • Positive submersible pump shutdown in the event of a Capabilities <br /> leak. • Performs a 3.0 gph leak and pressure test after every <br /> • Optional feature of T5 Series fuel management system. dispense cycle or 45 min. Positive shutdown of the <br /> affected turbine(s) on test failure. <br /> • Intrinsically safe and explosion proof options. <br /> • Performs a 0.2 gph monthly and 0.1 gph annual <br /> • Dispenser hook isolation and turbine pump interface precision leak test during the thermally stable periods <br /> (TPI) pump control options. of dispensing.Optional positive shutdown of the <br /> • Remote access to line pressure,test,and alarm affected turbine(s) on test failure. <br /> information. • Performs pressure up,catch pressure,and other <br /> additional checks.Alarm only on test failure. <br /> Approvals <br /> •TS-LSU500: UL,cUL,ATEX,IECEx <br /> •TS-LSU500E: UL,cUL <br /> •Third party certification of leak detection capabilities. <br />