My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:45:31 PM
Creation date
11/8/2018 9:57:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
9/9/2016 6:45:56 PM
QuestysRecordID
3187990
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUEL MANAGEMENT SYSTEMS <br /> jFranklinFuelingSystems I LINE LEAK DETECTION <br /> OrderingInformation <br /> Minimum Console Requirements <br /> •TS-550/5000,TS-550/5000 evo fuel management system REQEIN <br /> . <br /> � <br /> •TS-ELLD software options NOV 16 2018 <br /> •TS-ACI,TS-4201B or TS-420EXP, *TS-RLY Modules <br /> *TS-RLY module is not required when utilizing turbine pump interface(TPI)communications. ENVIRONMENTAL HEALTH <br /> Intrinsically Safe FIEPARTMFNT <br /> For new installations where separate low voltage conduits can be used.Use TS-42018 module. <br /> ••- <br /> Description <br /> TS-LS500/2 2-line transducer kit <br /> TS-LS500/3 3-line transducer kit <br /> TS-LS500/4 4-line transducer kit <br /> Explosion Proof <br /> For retrofit installations where only a high voltage conduit can be used.Use TS-420EXP module. <br /> ModelDescription <br /> 1S-LS500E/2 2-line transducer kit,explosion proof <br /> TS-LS500E/3 3-line transducer kit,explosion proof <br /> TS-LS500E/4 4-line transducer kit,explosion proof <br /> Note:Using turbine pump interface(TPI) communications eliminates the need for a <br /> TS-RLY module;Franklin Fueling Systems intelligent controllers required. <br /> Alternative Fuels Accessories <br /> For new installations where separate low voltage conduits can be used. Use TS-42018 module. <br /> ••- Description <br /> TS-AFALNIP Leak generator needle valve kit required for E85 <br /> installations <br /> RE—C—C—)NI <br /> A Franklin Fueling Systems Brand <br /> franklinfueling.com <br /> 3760 Marsh Rd.•Madison,WI 53718,USA <br /> Tel:+I 608 838 8786•Fax:+1 608 838 6433 1� ape a <br /> Tel:USA&Canada+1 800 225 9787•Tei:UK+44(0)1473 243300 MEMBER <br /> Tel:Mex 001 800 738 7610•Tel:FR+33(0)1 69 21 41 41 •Tel:CH+86 10 8565 4566 <br /> FFS-0263 06-14 Belden-is a trademark of Belden Technologies,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.