My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONLY apply fiberglass stripy horizontally (ACROSS the piping sump, not up and down.) <br /> The completed glass job should be air-free, seamless and ripple-free as shown in Fig. C.9.3. <br /> Fig. C.9.3 <br /> Fig. C.9.1 Fig. C.9.2 <br /> Roll over the fiberglass mat many times with a Chamfer roller (provided) on the OUTSIDE JOINT <br /> to make sure it is cleanly adhered to the fiberglass piping sump walls. Run the roller up and down to <br /> force any air out from under the fiberglass strip. (Fig. C.9.2) <br /> C.1 U - Repeat Steps CA to C.9 and apply fiberglass strips to the INSIDE JOINT of the piping <br /> sump. (Fig. C.10.1) For the INSIDE fiberglass strips use a Barrel roller to apply the strips to the <br /> curved surface. (Fig. C.10.2) <br /> i <br /> a <br /> Fig. C.10.1 Fig. C.10.2 Fig. C. <br /> C.11 - Use a Chamfer roller to carefully roll over the applied fiberglass strips to run out any air <br /> bubbles. (Fig. C.11) <br /> C.12 - Allow at least 4 hours at 75 Degrees to cure. During this time, continue on to other sumps. <br /> C.13 - When all fiberglass applications have cured, sand them down Fig. C.13 <br /> lightly with air-sander or roughly with coarse 40 - 60 grit sandpaper all <br /> the way around the piping sump to knock down all excess fiberglass 'hair' <br /> and material. (Fig. C.13) <br /> C.14 - Mix resin and apply with paint roller, completely covering the <br /> fiberglass material all the way around the piping sumps. Roll resin generously <br /> with paint roller. DO NOT USE PUTTY KNIFE or other scraping tool. <br /> The resin needs to be applied generously and evenly. (Fig. C.14) Fig. C.14 <br /> C.15 - Now install any/all equipment in the piping sump(s) that will not <br /> interfere with fiberglassing the top portion of the sump. Install all necessary <br /> equipment per local code & regulations. Follow installation instructions / <br /> recommendations / warnings provided by equipment manufacturer(s). <br /> 10 ii-6401-DW-SP-1 OA <br />
The URL can be used to link to this page
Your browser does not support the video tag.