My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E - PREPARING THE TANK SUMP BASE AND BODY <br /> E.1 - Trim the Top of sump BASE 2" from TOP <br /> EDGE only using a carbide tipped blade or mason- <br /> ry saw. Material must be cut square with a 1/4" +/- <br /> tolerance to open the double wall space 3600 <br /> around sump. (Step E.1) BODY <br /> E.2 - Abrade with air-driven sander (Fig. E.2) 4 <br /> inches down from the cut - Inside and Outside - <br /> until fiberglass surface can be seen clearly. Dust off <br /> with shop brush and keep clean. Step EA <br /> E.3 - Measure your distance from the top of the <br /> cut edge of the Tank Sump BASE to your planned <br /> Grade. Measure the height of your Tank Sump Step EA <br /> BODY and determine how much you must cut from BASE <br /> the BOTTOM of the BODY to make the overall <br /> Installed height meet your Planned Grade Level. <br /> Mark your trim line. Double Check all <br /> calculations and verify with team members or overseers. <br /> E.4 - Trim from the Bottom of sump BODY the necessary amount from BOTTOM EDGE only <br /> using a carbide tipped blade or masonry saw. Material must be cut square with a 1/4" +/- tolerance <br /> to open the double wall space 3600 around sump. (Step EA) <br /> E.5 - Abrade with air-driven sander 4 inches up from the cut - Inside and Outside - until <br /> fiberglass surface can be seen clearly. Dust off with shop brush and keep clean. <br /> F - JOINING THE BODY TO THE BASE <br /> F.1 - Fit the clean Tank Sump BODY on the Installed Tank Sump BASE and ensure it is sitting <br /> squarely in place. Ensure walls are fully abraded 2" up or down from the cut edge. <br /> F.2 - Ensure Tank Sump BODY is centered, plumb and stationary prior to and during the <br /> application of masking tape and paste. Alignment is critical. <br /> F.3 - You must remove again screw on the SVA-BARB (Schrader Valve Adapter w/Barb) 1 <br /> (Refer to B.3) on the Tank Sump BODY that will be fiberglassed. <br /> While Fiberglassing, curing, or sitting overnight, keep the SVA-BARB in place. This will <br /> relieve stress on the Interstice while the sumps are heating up or cooling off. <br /> SAVE THESE PIECES, DO NOT LOSE THEM! Remove the SVA-BARB when ready to test. <br /> 12 ii-B401-DW-SP-10A <br />
The URL can be used to link to this page
Your browser does not support the video tag.