Laserfiche WebLink
FA Apply provided masking t�e to the joint edge overlapping the Fig. F.4 <br /> ends securely. Tape the inside and outside joint of the transition. Use <br /> extra if necessary. (Fig. FA) � <br /> F.5 - Get your Paste Kit and tools together. Ensure surfaces inside <br /> and outside of the joint and surrounding walls are clean of debris and <br /> COMPLETELY DRY! <br /> 6 F. <br /> F.6 - Mix catalyst (bottle with RED sticker) and paste together in Fi g• _ <br /> plastic mixing bucket (provided) with stir stick. Mix thoroughly until paste <br /> has changed in color and is consistent. (Fig. F.6) <br /> {►��MI <br /> CATALYST BOTTLE FOR PASTE HAS A RED STICKER <br /> FOR SUMMER!!! 1/2 bottle per 1/4 Gallon of putty. <br /> FOR WINTER !!! 1 bottle per 1/4 Gallon of putty. <br /> OWear protective goggles and a mask <br /> when mixing and applying resin or paste. <br /> F.7 - Proceed to apply the mixed paste material to the sump joint, over the applied tape and over <br /> its edges to meet the fiberglass wall. Do not be sloppy. The more paste you smear past the tape, the <br /> more work you need to do to remove it later. <br /> F.8 - Wait until the material (paste seal) physically hardens (cures), nominally a minimum of One <br /> Hour @ or above 75 degrees fahrenheit. PIPING SUMP MUST NOT BE DISTURBED <br /> DURING THIS TIME TO AVOID MISALIGNMENT. <br /> F.9 - After exterior joint(s) have fully cured, mix paste and smoothly apply to the inside joint of the <br /> piping sump over the tape and its edges. Visually inspect the Joints that the paste has been applied <br /> to and look for gaps or delaminating. Ventilate sump accordingly, if Fig. F.10 <br /> mandated by local or federal regulations. <br /> F.10 - After Paste has fully cured, grind down all previously <br /> abraded areas (Fig. F.10) and lightly touch up pasted area with <br /> additional paste as needed. Dust off abraded areas. <br /> G - TESTING THE BODY TO BASE INSTALL <br /> Remove & save the SVA-BARB from the Gauge Assembly Schrader Valve (Refer to Step B.3) <br /> G.1 - Pressurize the interstice to 4 PSI and soap the new fiberglass joint, inside and outside. If <br /> sump is holding, keep record. <br /> If any leaks are found, Refer to Step D.3 <br /> ALLOW ANY REPAIRS TO FULLY CURE BEFORE TESTING SUMP AGAIN <br /> 13 ii-8401-D W-S P-10A <br />