Laserfiche WebLink
J = VACUUM / HYDROSTATIC FILLING <br /> FIELD AIR INTEGRITY INSPECTION TEST : Fim;0gumAyal <br /> YOUR PRODUCT WARRANTY WILL BE VOID IF YOU DO NOT Hold pressure <br /> for a minimum of 1 hour for a Field Integrity Inspection Test. After passing <br /> the pressure test, it is HIGHLY RECOMMENDED that the 4 PSI is <br /> maintained for as long as possible, up until the time of backfill. <br /> YOUR PRODUCT WARRANTY WILL BE REVOKED IF YOU <br /> CHOOSE TO SKIP THE AIR INTEGRITY TEST OUTLINED IN YOUR <br /> COPY OF YOUR PRODUCT INSTALLATION INSTRUCTIONS. YOU MUST COMPLETE THE <br /> PRESSURE TEST PRIOR TO HYDROSTATIC FILLING OF THE SUMPS. <br /> The Bravo Double Wall product's ship from the factory with a combination gauge factory- installed <br /> and held under 20" of mercury / vacuum. <br /> J.1 - After passing the Field Air Integrity Test per the Installation Instructions and there are no <br /> signs of leaks, you must cut the permanently affixed pipe plug from the tubing connected to the side <br /> wall. This is NOT the tubing with the gauge connected to it. <br /> J.2 - Connect (newly cut) open end of tubing to barb-and-ball-valve assembly. (sold seperately) <br /> A 36" length of clear tubing is factory installed to the barb-and-ball-valve assembly. <br /> Barb & Ball Valve <br /> Cut Plug end off Assembly After the penetration <br /> from tubing fittings have been <br /> Oinstalled, the vacuum has <br /> been lost. Pressure/soap <br /> tests should have been <br /> conducted prior to filling <br /> Connect the sumps with liquid. <br /> Assembly to <br /> tubing i <br /> i You must cut off the barbed <br /> plug and connect the <br /> provided Barb & Ball Valve <br /> Assembly. Close off the ball <br /> valve and prepare the <br /> Venturi Vacuum Generator <br /> and air supply to be used to <br /> i fill Sump with liquid. <br /> 17 i i-B401-D W-S P-10A <br />