My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J.3 - Close off ball valve coMpletely and prime <br /> the open ended 36" length of clear tubing with <br /> provided Interstitial Fluid. Use a liquid funnel. f � t <br /> AWINGi <br /> Filling Bravo Systems Double <br /> Wall Products with Brine (saline) solution <br /> will void the product warranty. You must use only <br /> Bravo-Supplied Interstitial Fluid, part # IMF-1GAL <br /> AIR <br /> Barb & <br /> Ball Valve <br /> Assembly <br /> Venturi Vacuum Generator <br /> After liquid fill, Conduct the <br /> Advanced Leak Detection <br /> Bucket Procedure, then Cut the ball <br /> valve assembly from its tubing <br /> and connect open end of tubing <br /> to Primary manometer. Also <br /> unthread the Gauge Assembly <br /> and use provided PVC threaded <br /> plug to close off open test port <br /> fitting. <br /> J.4 - After filling the tubing all the way to the ball valve, insert open end into your liquid source. <br /> (5 gallon bucket filled with fluid is recommended.) <br /> J.5 - When ready, pull vacuum using the Venturi Vacuum Assembly (sold seperately) to 20 Inches <br /> of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to flow freely into the system at a <br /> rate of about 2 gallons a minute. <br /> ! ...SLOWLY open ball valve.. . <br /> J.6 - STOP PULLING VACUUM WHEN THE LIQUID IS 2-3 INCHES FROM THE VERY TOP OF <br /> THE INTERSTITIAL SPACE / TEST PORT. This is easily visible while filling the DoubleWall Product. <br /> 18 ii-8401-DW-SP-10A <br />
The URL can be used to link to this page
Your browser does not support the video tag.