Laserfiche WebLink
While Fiberglassing, curing, or sitting overnight, keep the <br /> SVA-BARB in place. This will relieve stress on the Interstice <br /> while the sumps are heating up or cooling off. <br /> SAVE THESE PIECES, DO NOT LOSE THEM! Remove the SVA-BARB when ready to test. <br /> a= <br /> n y � <br /> Gauge CAP SVA-BARB <br /> Assembly <br /> PRIMARY LINE PENETRATION FITTINGS <br /> A.6 - Install all the required number of doublewall penetration fittings per their respective <br /> Installation Instructions (Fig. AA). <br /> Fi <br /> � 2 DO NOT FILL DOUBLE WALL PENETRATION l 711 <br /> FITTINGS WITH FOREIGN MATERIALS, SEALANTS or ADHESIVES! <br /> ELECTRICAL FITTINGS & CONDUITS <br /> A.7 - Next generation Bravo UDC's feature an electrical offset frame that allows you to install your <br /> conduits on the exterior of the sump and up into the side panel of your dispenser. <br /> A.8 - Following your installation of the doublewall penetration fittings, you must <br /> FIRST TEST THE INTEGRITY OF THE BOX, SINCE THE INITIAL VACUUM HAS BEEN LOST. <br /> A.9 - Using the factory-provided & installed pressure/vacuum combination gauge, Pressure the <br /> sump to 4 PSI and soap ALL fittings, and any field repairs, inside and outside. If foaming leaks are <br /> found, Skip to Step B.2. <br /> PRIMARY AND SECONDARY PIPING <br /> A.1 U - Please refer to your pipe manufacturer's Installation Instructions. <br /> A.1 1 - When finished with the installation of pipe lines, pressure sump again to no more than 4 <br /> PSI and soap all penetration fittings, inside and outside. Again, if leaks are found, skip to Step B.2 <br /> S. Bravo Systems, Inc. Highly recommends the Air <br /> Integrity Test (Step B.1) to be completed at this time, after <br /> the penetration fittings have been installed correctly. <br /> 5 ii-B8000-9000-DW-11B <br />