My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B - Air Integrity Test <br /> Remove & save the SVA-BARB from the <br /> Gauge Assembly Schrader Valve `n <br /> B.1 - Use test assembly and pressure sump to 4 PSI. <br /> Close off with ball valve and resume other work. <br /> Allow 1 Hour before recording pressure. *. F <br /> FIELD AIR INTEGRITY INSPECTION TEST <br /> Hold pressure for a minimum of 1 hour for a <br /> BRAVO Field Integrity Inspection Test. After y <br /> QUALITY passing the pressure test, the sump <br /> STANDARD should immediately be filled with interstitial <br /> monitoring fluid for the rest of the construction period. <br /> Hold pressure for a minimum of 1 hour for a Field Integrity Inspection Test. <br /> The Under Dispenser Containment Sump PASSES the integrity test if the Sump shows hLQ <br /> signs of continuous pressure decay. IF TEST PASSES - CONTINUE ON TO THE HYDROSTAT- <br /> IC FILL & INTEGRITY TEST, outlined in SECTION C. <br /> S. Bravo Systems Highly Recommends <br /> an Extended pressure test. <br /> 13.2 - IF ANY LEAKS ARE FOUND!! <br /> a: On factory-installed gauge, pressure sump Interstice to EXACTLY 4 PSI. <br /> b: Close off interstice with ball valve and soap exterior of dispenser sump body, paying close attention to <br /> penetration fittings, edges and corners. <br /> e: Locate leak point(s) and mark with marker so you can locate it/ monitor it. <br /> c: Repair or reinstall penetration fittings according to your doublewall penetration fitting manufacturers' <br /> Installation / Maintenance Instructions. <br /> d: Occasionally... Bravo Fiberglass Series Products may suffer mild damage in transit or field installation. <br /> Please take a close look at edges and corners. <br /> f: Abrade a 2" diameter area centered on the leak point until flow coat is gone and natural resin/fiberglass <br /> material can be seen. Dust with shop brush or compressed air and do not use shop towels or acetone. <br /> S. Bravo Systems recommends "Smith Fibercast Adhesive Kit#8014" to repair and reinforce Bravo <br /> Fiberglass products. Make sure area is completely dry and apply resin generously while pulling -2 PSI <br /> vacuum to suck adhesive into pinhole leak for 1 minute. For anything larger than pinhole leaks you must <br /> consult the factory. <br /> g: Let cure for a minimum of 4 hours @ or above 75° Fahrenheit. <br /> 13.3 - IF ANY REPAIRS ARE MADE, After Cure, Repeat Steps B.1 to B.2 <br /> FOR HYDROSTATIC MONITORING - PROCEED TO STEP 13.4. <br /> FOR CONTINUOUS VACUUM MONITORING - The B8000 and 9000 Series Sump cannot exceed <br /> 16" of Mercury. Follow your vacuum system manufacturer's installationinstructions to install, <br /> seal, and monitor the doublewall system with vacuum. Continue on to Step E. <br /> Ensure that the fittings that are being used with the <br /> Vacuum Monitored System can withstand the amount <br /> of Vacuum your Monitoring System will generate. <br /> 6 ii-B8000-9000-DW-11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.