Laserfiche WebLink
B - Air Integrity Test <br /> Remove & save the SVA-BARB from the <br /> Gauge Assembly Schrader Valve `n <br /> B.1 - Use test assembly and pressure sump to 4 PSI. <br /> Close off with ball valve and resume other work. <br /> Allow 1 Hour before recording pressure. *. F <br /> FIELD AIR INTEGRITY INSPECTION TEST <br /> Hold pressure for a minimum of 1 hour for a <br /> BRAVO Field Integrity Inspection Test. After y <br /> QUALITY passing the pressure test, the sump <br /> STANDARD should immediately be filled with interstitial <br /> monitoring fluid for the rest of the construction period. <br /> Hold pressure for a minimum of 1 hour for a Field Integrity Inspection Test. <br /> The Under Dispenser Containment Sump PASSES the integrity test if the Sump shows hLQ <br /> signs of continuous pressure decay. IF TEST PASSES - CONTINUE ON TO THE HYDROSTAT- <br /> IC FILL & INTEGRITY TEST, outlined in SECTION C. <br /> S. Bravo Systems Highly Recommends <br /> an Extended pressure test. <br /> 13.2 - IF ANY LEAKS ARE FOUND!! <br /> a: On factory-installed gauge, pressure sump Interstice to EXACTLY 4 PSI. <br /> b: Close off interstice with ball valve and soap exterior of dispenser sump body, paying close attention to <br /> penetration fittings, edges and corners. <br /> e: Locate leak point(s) and mark with marker so you can locate it/ monitor it. <br /> c: Repair or reinstall penetration fittings according to your doublewall penetration fitting manufacturers' <br /> Installation / Maintenance Instructions. <br /> d: Occasionally... Bravo Fiberglass Series Products may suffer mild damage in transit or field installation. <br /> Please take a close look at edges and corners. <br /> f: Abrade a 2" diameter area centered on the leak point until flow coat is gone and natural resin/fiberglass <br /> material can be seen. Dust with shop brush or compressed air and do not use shop towels or acetone. <br /> S. Bravo Systems recommends "Smith Fibercast Adhesive Kit#8014" to repair and reinforce Bravo <br /> Fiberglass products. Make sure area is completely dry and apply resin generously while pulling -2 PSI <br /> vacuum to suck adhesive into pinhole leak for 1 minute. For anything larger than pinhole leaks you must <br /> consult the factory. <br /> g: Let cure for a minimum of 4 hours @ or above 75° Fahrenheit. <br /> 13.3 - IF ANY REPAIRS ARE MADE, After Cure, Repeat Steps B.1 to B.2 <br /> FOR HYDROSTATIC MONITORING - PROCEED TO STEP 13.4. <br /> FOR CONTINUOUS VACUUM MONITORING - The B8000 and 9000 Series Sump cannot exceed <br /> 16" of Mercury. Follow your vacuum system manufacturer's installationinstructions to install, <br /> seal, and monitor the doublewall system with vacuum. Continue on to Step E. <br /> Ensure that the fittings that are being used with the <br /> Vacuum Monitored System can withstand the amount <br /> of Vacuum your Monitoring System will generate. <br /> 6 ii-B8000-9000-DW-11B <br />