Laserfiche WebLink
San Joaquin County <br /> *Mber,8, <br /> Environmental Health Department DIRECTOR <br /> Donna Heran, REHS <br /> 600 East Main Street <br /> Stockton California 95202-3029PROGRAM COORDINATORS <br /> ' Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Website: www.sjgov.org/ehdKasey Foley,REHS <br /> Phone: 209 468-3420Linda Turkatte,REHS <br /> 2011 ( ) <br /> Fax: (209) 464.0138 <br /> Sean Murphy <br /> Town & Country Contractors Inc <br /> 3181 Luyung Drive, Suite A <br /> Rancho Cordova, CA, 95742 <br /> Re: Arco AM/PM SR0063145 <br /> 550 West Valpico Road, Tracy, CA, 95376 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the permit application to install the following underground storage tank (UST) system at the <br /> above noted address: <br /> 20,000 gallon UST(ID#39-000231656-0520359) regular unleaded, <br /> 12,000 gallon UST (ID#39-000231656-0520360) premium unleaded (split tank w/diesel), <br /> 10,000 gallon UST(ID#39-000231656-0520361) diesel (split tank with premium unleaded), <br /> along with the associated piping, eight dispensers, turbine pumps, and appurtenances. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the City of Tracy Fire Department and the San Joaquin Valley Air Pollution Control <br /> District for applicable permits. <br /> 2. Contact Thuy Tran, REHS at(209) 468-8257 for the following inspections: <br /> a. Delivery and setting of tanks: pre-installation testing per manufacturer's guidelines. <br /> b. Visual inspection of piping to insure proper slope prior to backfill. <br /> c. 24-hour hydrostatic test(or equivalent) on all UDCs, sumps and secondary containment <br /> collar. <br /> d. Primary piping soap test: One hour pneumatic pressure test at 110% of operating <br /> pressure, or 40 psi, whichever is greater on all piping including product piping, vapor <br /> recovery and vent line. <br /> e. Secondary piping soap test: One hour pressure test per manufacturer's guidelines. If <br /> there are no manufacturer's guidelines, test shall be performed using an applicable <br /> method specified in an industry code or engineering standard on all piping including <br /> product piping, vapor recovery and vent line. <br /> f. Leak detector test: Leak detector must be tested to confirm that the device can detect a <br /> leak of 3 gallons per hour at 10 psi. <br /> g. Vapor and Fill Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour <br /> hydrostatic test(or equivalent). Proper drainage must also be verified on the fill bucket. <br /> h. Sensor functionality: Functionality of the monitoring system must be verified to ensure <br /> that monitoring meets the requirements of Title 23 California Code of Regulations and <br /> the Health & Safety Code. Prior to receiving fuel, a complete functional test of tank and <br /> piping monitoring system(s) and demonstration of positive shut down. <br />