My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arco AM/PM 550 West Valpico Road, Tracy <br /> SR0063145 <br /> 12. Sumps and under dispenser containment must be constructed in a manner to prevent <br /> vapors from entering the backfill. <br /> 13. All secondary containment must be constructed to prevent water intrusion. All gaskets/ <br /> seals must be installed on the inner sumps lids. <br /> 14. The secondary containment system must be continuously monitored as required under <br /> California Health & Safety Code (HSC) 25290.1 <br /> 15. Overfill prevention shall satisfy CCR 2635(b)(2)(C) pursuant to the permit application. <br /> 16. All metal components in direct contact with the ground such as flexible connectors, swing <br /> joints, fittings, clamps, bands, and pumps shall have corrosion protection. <br /> 17. The plans call for grounding the fill and vapor risers by penetrating the sump walls. All <br /> penetrations of grounding wires must be third party approved. <br /> 18. A "Certification of Installation / Modification"form for each tank shall be submitted by the <br /> owner or the owners' agent [pursuant to CCR 2635(d)] before this install will be considered <br /> complete by EHD. <br /> 19. An accurate and drawn to scale as-built plan must be submitted to the EHD prior to <br /> scheduling a final inspection. <br /> 20. No gasoline, diesel, or other hazardous material or waste can be released (intentionally or <br /> unintentionally) to the sewer/septic, storm water system, or any other waters of the state. <br /> If a release occurs it will be considered illegal hazardous waste disposal and will be <br /> subject to enforcement. <br /> 21. Submit the Best Management Practices (BMP) to EHD for managing fuel spills and wash- <br /> down water at this site prior to the final inspection. <br /> 22. Submit correct and complete Monitoring and Response Plans prior to scheduling a final <br /> inspection. <br /> 23. Submit a Certification of Financial Responsibility for Underground Storage Tanks <br /> containing petroleum form with the appropriate mechanism prior to scheduling a final <br /> inspection. <br /> 24. Contact and submit form BOE-400-UST to the Board of Equalization to obtain a UST <br /> Storage Fee Account Number. Contact California BOE, Fuel Tax Division at (800) 400- <br /> 7115. Forms can be located at http://www.boe.ca.gov/pdf/boe400ust.pdf <br /> 25. Enhanced Leak Detection (ELD) passed test results must be received prior to receiving <br /> fuel. <br /> 26. Contact Thuy Tran, REHS at (209) 468-8257 for inspections. See the inspection checklist <br /> for the required inspections. All appointments must be scheduled 48 hours in advance. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.