Laserfiche WebLink
r"CS� m dem v�lel ,m�1com <br /> TOfR J.oA.ti l--� • <br /> FABRICATORS OF %1TAL PROOUCTS <br /> INSTALLATION PRO DURES FQR OL-ASTEELII UNOEROROUNO <br /> STQRAGE _TANKS <br /> CAUTION : N . F . P . A . - 30 : TIGHTNESS T _STINO RNSIBILITY OF THE OWNER TO PROVIDE THE FOLLOWING TESTS <br /> ?RIOR TO COVERING THE TANK ( S . ) <br /> \IF . P . A . - 30U, 2 - 8 . 3 ' I " SECONDARY CONTAINMENT TANKS ( TYPE I AND <br /> II ) SHALL HAVE THE PRIMARY ( INNER ) TANK TESTED ACCORDING TO <br /> 2 - 8 . 3 AND THE INTERSTITIAL SPACE ( ANNULUS ) TESTED USING OR <br /> /ACUUM AT 5 . 3 IN . HO . THE . . . VACUUM SHALL BE HELD FOR ONE <br /> /ACUUM . HOUR . CARE SHALL BE TAKEN TO ENSURE THAT THE <br /> NTERSTITIAL SPACE IS NOT OVERPRESSURED OR SUBJECTED TO <br /> :XCESSIVE VACUUM . ' <br /> I . F . P . 6 . - 30 : ? - 8 4 : 7BEFORS THE TANK IS INTIALLY PLACED IN <br /> ;ERVICE . ALL LEAKS SHALL BE CORRECTED IN AN ACCEPTABLE MANNER . ' <br /> I . F . P . A . - 31 " STANDARD FOR INSTALLATION OF OIL BURNING EQUIPMENT . ' <br /> [OLE S 12ES FOR INSTALLATION OF TANKSIN I STAG( G ' <br /> SO 1 GONDZT I ONS_; <br /> ,NERAL NOTES ( ' <br /> THS EXCAVATED OPENING POR INSTALLATION OP' UNDERGROUND TANK (S ) SHALL BE( <br /> JITASLY EXCAVATED (REFER TO OSHA . STATE. OR LOCAL CODES GOVERNING <br /> PEiNINGS . ) LEVELED AND BACKFILLED PER THE FOLLOWING INSTRUCTIONS . - <br /> REFER TO THE 'FINISHING INSTRUCTIONS ' FOR SPECIAL REOUIRMENTS PRIOR TO <br /> 'JRIAL OF "OLASTELL." TANKS . <br /> . TANKS SHALL BE COM%ETLY EMPTY DURING HANDLING OR INSTALLATION TO PREVENT <br /> VDUE STRESS TO THE TANK( S . ) <br /> IN THE EVENT A TANK MIST BE INSTALLED . FILLED WITH PRODUCTS . PRIvR TO <br /> NCKFILLINO. THE LIOUID LEVEL WITHIN THE TANK SHALL NOT EXCEED THE N�.OMPACTED <br /> �CKFILL LEVEL . - <br /> ONCp NOTS'A' THC FOUNDATION FOR VNDCROROVND TANK(SI <br /> Cf2 O�/TN. A0$OIL SHALL BE A MINIMUM OP S' CLEAN <br /> COMPACT20 SAND. OR S' OR 3/4' PEA <br /> Cl rtv,t.I tv atv t•r rtv vrt GRAVCL. <br /> NOTE"EI " TANK($) INSTALLED IN AN AREA THAT IS <br /> SUBJECT TO HRAVY VEHICULAR TRAFFIC <br /> SHALL HAVE A PROTECTIVC COVER OP IS' <br /> (> A.aTd" CLCAN COMFACTCD SOIL WITH CITHER S' <br /> F CO��IJ �C1�C) OF RBINRORCCD CONCRETC. OR S' OR <br /> Q . ASPHALT PAVING. IF COMPACTED SOIL IS' <br /> .TO BE THC ONLY COVER IT SHALL BE A <br /> MINIMUM OF 36' DEEP. <br /> �c> d� a..Im• t''a d <br /> �tJ�C)� lJafJ�� NOTE'32' TANK(S) INSTALLED IN AN AREA NOT <br /> SUBJECT TO HEAVY VEHICULAR TRAFFIC <br /> C)�JaC') "' """•'� "'1i SHALL 86 PROTECTED WITH CITHER 24" OF <br /> CLEAN COMPACTCD SOIL COVERED BY 4' <br /> CRC92 EwCTTCN Of EXCAVATIMN THICK REINFORCED CONCRCT6 OR O' THICK <br /> ASPHALT FAVI NO. <br /> I'�TB'CI ' pINOLE TANK INpTALLAT10Nr MINIMUM OF <br /> 12' <br /> FROM TMC OUT7106 000,{ OF TANK TO <br /> SIDE BOOS OF THE EXCAVATED <br /> OPENING. <br /> CIS 0 <br /> W NOTP•C2' MULTILS TANK INITALLATION SAME ED02 <br /> (Z� DISTARNCES A9 SINGLE TANK INSTALLATION. <br /> AND A MINIMVM OF 12' FROM OUTSIDE <br /> EDGE OF THE TANKS. <br /> NOTE D' THC MINIMUM DISTANCE FROM THE OUTS102 <br /> OTE'CE' NOTE'O' ENDS OF THE TANK(S) TO THC INSIDE MOOS <br /> OF THC OPENING SHALL BE A MINIMUM OF <br /> FLAN AY AULTIPLq YALX INSTALLATION 12 <br />