My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JUN 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO_JUN 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:51:00 PM
Creation date
11/8/2018 9:58:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JUN 2016 - 2018
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO JUN 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO JUN 2016 - PRESENT
QuestysRecordDate
9/13/2016 6:46:00 PM
QuestysRecordID
3135584
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_3 of_7_ <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 0—15 PSI GAUGES Equipment Resolution: +or—0.05 psi <br /> Piping Run#T-6 87 Piping Run#T-7 87 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3"over 2" 3" over 2" <br /> Length of Piping Run: Approx.45' Approx.45' <br /> Product Stored: 87 unleaded 87 unleaded <br /> Method and location of Test Boot @ STP Test Boot @ STP <br /> piping-run isolation: Sump Sump _ <br /> Wait time between applying _ .. <br /> pressure/vacuum/water and 10 min. 10 min. <br /> starting test: <br /> Test Start Time: 8:45am 8:45am ENI <br /> Initial Reading(R,): S.Opsi 5.Opsi <br /> Test End Time: 9:45am 9:45am <br /> Final Reading(RF): 5.0psi 5.0psi <br /> Test Duration: 1 hr. 1 hr. <br /> Change in Reading(RF-R,): O.Opsi O.Opsi <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: 11 ®Pass ❑ Fail ®Pass ❑Fail ❑ Pass ❑ Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.