Laserfiche WebLink
SWRCB,January 2002 Page_3 of_7_ <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 0—15 PSI GAUGES Equipment Resolution: +or—0.05 psi <br /> Piping Run#T-6 87 Piping Run#T-7 87 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3"over 2" 3" over 2" <br /> Length of Piping Run: Approx.45' Approx.45' <br /> Product Stored: 87 unleaded 87 unleaded <br /> Method and location of Test Boot @ STP Test Boot @ STP <br /> piping-run isolation: Sump Sump _ <br /> Wait time between applying _ .. <br /> pressure/vacuum/water and 10 min. 10 min. <br /> starting test: <br /> Test Start Time: 8:45am 8:45am ENI <br /> Initial Reading(R,): S.Opsi 5.Opsi <br /> Test End Time: 9:45am 9:45am <br /> Final Reading(RF): 5.0psi 5.0psi <br /> Test Duration: 1 hr. 1 hr. <br /> Change in Reading(RF-R,): O.Opsi O.Opsi <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: 11 ®Pass ❑ Fail ®Pass ❑Fail ❑ Pass ❑ Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />