Laserfiche WebLink
SWRCB,January 2002 Page_4_of 7 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑ Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution: 0.002" <br /> Sump#T-6 87 Sump#T-7 87 Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 56" 58" .� <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 18" N 2 6 2018 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 73" 14" <br /> Electrical Penetration: ,- <br /> Condition of sump prior to testing: Dry Dry ENVI f �. - <br /> Portion of Sump Tested' 2"/Penetrations 2"/Penetrations <br /> Does turbine shut down when <br /> sump sensor detectsliquid(both ®Yes ❑No ❑NA ®Yes ❑No ❑NA Elves ❑No LINA Elves ❑No DNA <br /> roduct and water)? <br /> Turbine shutdown response time 4 seconds 3 seconds <br /> Is system programmed for fail-safe <br /> shutdown?* ®Yes ❑No [INA [9 ❑Na [INA Elves ❑No ❑NA Elves ONO ❑NA <br /> Was fail-safe verified to be <br /> operational?* <br /> ®Yes ❑No DNA ®Yes LINO [INA Elves ❑No ❑NA Elves ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 min. 10 min. <br /> test: <br /> Test Start Time: 11:05am 11:05am <br /> Initial Reading(R): 3.8814" 6.2460" <br /> Test End Time: 11:20am 11:20am <br /> Final Reading(RF): 3.8798" 6.2462" <br /> Test Duration: 15 min. 15 min. <br /> Change in Reading(RF-R,): -0.0016" +0.0002" <br /> Pass/Fail Threshold or Criteria: +/-0.002" +1.0,002" +/-0.002" +/-0.002" <br /> Test Result: ® Pass ❑Fail ®Pass ❑ Fail ❑Pass ❑Fail ❑Pass ❑ Fail <br /> Was sensor removed for testing? ®Yes ❑No DNA ®Yes ❑No ❑NA Elves ❑No DNA Elves LINO ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> ®Yes LINO ❑NA ®Yes ❑No ❑NA Elves ❑No ❑NA Elves ❑No ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />