Laserfiche WebLink
SWRCB,January 2002 Page 5 of_7_ <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum E Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution: 0.002" <br /> 00000� UDC#1-2 UDC#3-4 UDC# UDC# <br /> UDC Manufacturer: Bravo Pan Bravo Pan <br /> UDC Material: Steel Steel <br /> UDC Depth: 12" 12" <br /> Height from UDC Bottom to Top 2 5" 2.5" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to NIA N/A <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry ENVIRONMENTAL HEALTH <br /> testing: <br /> n <br /> Portion of UDC Tested 2"/Penetrations 2"/Penetrations F' " <br /> ?A ENT <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes LINO ®NA Elves ❑No ®NA []Yes ❑No ❑NA ❑Yes []No [INA <br /> product and water)?* <br /> Turbine shutdown response time N/A NIA <br /> Is system programmed for fail- <br /> safeshutdown? ❑Yes [--]No ❑NA [:]Yes []No ®NA ❑Yes ❑No ❑NA []Yes ❑No ❑NA <br /> Was fail-safe verified to be []Yes ❑No [INA ❑Yes <br /> operational? ❑No ®NA ❑Yes []No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. <br /> starting test <br /> Test Start Time: 11:05am 11:05am <br /> Initial Reading(R): 2.8635" 2.0797" <br /> Test End Time: 11:20am 11:20am <br /> Final Reading(Rr): 2.8628" 2.0801" <br /> Test Duration: 15 min. 10 min. <br /> Change in Reading(RF-Rj): -0.0007" +0.0004" <br /> Pass/Fail Threshold or Criteria: +/.0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: ®Pass ❑Fail ®Pass ❑ Fail ❑ Pass ❑Fail ❑Pass ❑ Fail <br /> Was sensor removed for testing? ❑Yes ❑No ®NA Elves ❑No ®NA ❑Yes ❑No ❑NA Elves [ No ENA <br /> Was sensor properly replaced and <br /> verified functional after testing? Elves ❑No ®NA Elves []No ®NA ❑Yes []No ❑NA ❑Yes ❑No ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1. All UDCs have chain and floats installed for primary leak detection.Verified proper functionality testing <br /> per manufacture guidelines and product shut-off @ shear valve when in leak position. <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />