My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for N-601-1-3 (continued) • • Page 3 of 4 <br /> 16. In the event of a separation due to a drive off,the permittee shall,unless otherwise specified in the applicable ARB <br /> Executive Order, conduct a visual inspection of the affected equipment and either 1)perform qualified repairs on any <br /> damaged components and conduct applicable re-verification tests pursuant to the requirements of this permit,or 2) <br /> replace the affected nozzles, coaxial hoses,breakaway couplings,and any other damaged components with new or <br /> certified rebuilt components that are ARB certified. The activities shall be documented in accordance with the <br /> requirements of this permit before placing the affected equipment back in service. [District Rule 46221 <br /> 17. The permittee shall conduct all periodic vapor recovery system performance tests specified in this permit,no more than <br /> 30 days before or after the required compliance testing date,unless otherwise required under the applicable ARB <br /> Executive Order. [District Rules 4621 and 4622] <br /> 18. The permittee shall perform and pass a Static Torque of Rotatable Phase I Adaptors test using ARB procedure TP- <br /> 201.1B within 60 days after initial start-up and at least once every 36 months thereafter. [District Rule 46211 <br /> 19. The permittee shall perform and pass a Pressure Integrity of Drop Tube Drain Valve Assembly Test using ARB TP- <br /> 201.IC or a Pressure Integrity of Drop Tube Overfill Protection Devices Test using ARB TP-201.1D if an overfill <br /> protection device is installed, within 60 days after initial start-up and at least once every 36 months thereafter. [District <br /> Rule 4621] <br /> 20. The permittee shall perform and pass a Static Leak Test for Underground Tanks using ARB TP-201.3 in accordance <br /> with the Executive Order specified in this permit for the Phase H Vapor Recovery System within 60 days after initial <br /> start-up and at least once every 12 months thereafter. [District Rules 4621 and 4622] <br /> 21. The permittee shall perform and pass a Dynamic Back Pressure Test using ARB TP-201.4 within 60 days after initial <br /> start-up and at least once every 12 months thereafter. [District Rule 4622] <br /> 22. The permittee shall perform and pass a Vapor-to-Liquid Volume Ratio Test using the test procedure defined in the <br /> Executive Order specified in this permit for the Phase H Vapor Recovery System within 60 days after initial startup <br /> and at least once every six(6)months thereafter. [District Rule 4622] <br /> 23. The permittee shall perform and pass a Static Pressure Test for the Healy Clean Air Separator using the test procedure <br /> defined in the Executive Order specified in this permit for the Phase H Vapor Recovery System within 60 days after <br /> initial startup and at least once every 12 months thereafter. [District Rule 4622] <br /> 24. The permittee shall perform and pass a Nozzle Bag Test using the test procedure defined in the Executive Order <br /> specified in this permit for the Phase H Vapor Recovery System within 60 days after initial startup. [District Rule <br /> 4622] <br /> 25. The permittee shall perform and pass a Dispenser vapor Line Tightness test for each dispenser using the test procedure <br /> defined in the Installation, Operation and Maintenance manual of the Executive Order specified in this permit for the <br /> Phase H Vapor Recovery System within 60 days after initial startup and at least once every 12 months thereafter. <br /> [District Rule 4622] <br /> 26. A person conducting testing of, or repairs to,a certified vapor recovery system shall be in full compliance with District <br /> Rule 1177 (Gasoline Dispensing Facility Tester Certification)by March 21,2008. [District Rules 4621 and 4622] <br /> 27. Effective June 20, 2008, a person performing installation of, or maintenance on, a certified Phase I or Phase II vapor <br /> recovery system shall be certified by the ICC for Vapor Recovery System Installation and Repair, or work under the <br /> direct and personal supervision of an individual physically present at the work site who is certified. The ICC <br /> certification shall be renewed every 24 months. [District Rules 4621 and 4622] <br /> 28. Effective June 20, 2008,proof of the ICC certification and all other certifications required by the Executive Order and <br /> installation and operation manual shall be made available onsite. [District Rules 4621 and 4622] <br /> 29. The permittee shall notify the District at least 7 days prior to each performance test. The test results shall be submitted <br /> to the District no later than 30 days after the completion of each test. [District Rule 4621] <br /> 30. The permittee shall maintain a copy of all test results. The test results shall be dated and shall contain the name, <br /> address, and telephone number of the company responsible for system installation and testing. [District Rule 4622] <br /> CONDITIONS CONTINUE ON NEXT PAGE <br /> N-W-1.3 AP 2120 4'31PM-DEMARIV <br />
The URL can be used to link to this page
Your browser does not support the video tag.