Laserfiche WebLink
•SWRCB,January 2002 • • Page of <br /> 9. SPILIJOVERFII.L CONTAINMENT BOXES <br /> .Facility is N2ffquipped With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested F <br /> Test Method Developed By: (1 Spill Bucket Manufacturer 0 Industry Standard LJ Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: 0 Pressure F;Vacuum n Hydrostatic <br /> 0 Other(Specify) <br /> Test Fiquipment Used: <br /> Equipment Resolution: <br /> Spm Box# SPUR Box# Spin Box# Spill Bo:p <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Stan Time: <br /> Initial Reading(Rt): <br /> Test End Time: <br /> Final Reading(RF); <br /> Test Duration: <br /> Change in Reading(RF ILS: <br /> Pase/Fatl Threshold or <br /> Criteria: <br /> Test ResulL. ❑ Pana 0 Fall ndFaUE]MPa= <br /> Comments— (include information on repairs made or to testing, and recommended follow-up forfailed lents) <br />