Laserfiche WebLink
' Dec -21 2007 11 : 5GAM HP LASERJET FAX P. 5 <br /> • • <br /> S WRCB,January 2002 Page-�3 of�a <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By. E Piping Manufacturer 94ndustry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: Rfressure 0 Vacuum 0 Hydrostatic <br /> 7 Other(Specify] <br /> Test Equipment Used: S l S Y52I JEquipment Resolution: Ps= <br /> Piping Run# KNLSPiping Run# O/F Piping Run# 4. ..a Piping Run# <br /> Piping Material: y3s�fnvre <br /> Piping Manufacturer. QpPiping Diameter. n Length of Piping Rua /Q Product Stored: V A)Method and location of Tg31, sa -sr,* Y+'"lsnr�r Su <br /> i -run isolation: yt4c,, ,� y�� c�Frhr�r r.s[ <br /> 46 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test , ytc7�1 Q <br /> Test Start Time: <br /> Initial Reading(Ril: 0 5_r• <br /> Test End Time: // 11 /61 <br /> Final Reading(RF): S,O004 r- <br /> Test Duration: At <br /> x7o 4>j <br /> Change in Reading(RF-R,): 3 0 <br /> Pass/Fail Threshold or j p5S <br /> Criteria: 13 /hllU -SOI��T 3deall?11 .?T�y2 30na i.yi/ <br /> W!Pnss ❑Faq <br /> ra�P as d: 1a! ntl o gra <br /> COIIIIltents— (include inform anon on repairs made prior to testing and recommended follow-up for ailed tests) <br /> eon 427vMZ127- 0L'&M1n) KA 'i FeR3. D,aSr 3T <br /> �CC6mM[-�131� j-{�2 rt,.teVl `TSS r.F`x GLl l� SECBn)I)f�U <br />