Laserfiche WebLink
UNDERGROU* STORAGE TANK MONSDRING PLAN <br /> For use by Unidoes Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR,Sections 1632(d)(1), 2634(d)(2),and 2641(h) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2,CHANGE OF INFORMATION mi. <br /> PLAN TYPE ❑ MONITORING I5 TOF.NTICAL FOR ALL USTS AT THIS FACILITY. • <br /> Check one item only ® THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S); <br /> I. FACILITY INFORMATION <br /> FACILITY LD p(Agency Use Only) I I I — I I I — <br /> FACILITY NAME Pacific Gas and Electric Company-Stockton Service Center h10. <br /> FACILITY SITE ADDRESS 4040 West Lane . M00 CITY Stockton Maa. <br /> II. EQUIPMENT'TES'T'ING AND PREVENTIVE MAINTENANCE <br /> State law requires that tasting,preventive maintenance,and calibration of monitoring equipment(e.g„sensors,probes,line leak detecton,etc.)be performed in NEW <br /> accordance with tho equipment maovfacturess'ierstuctions,or annually,wbicluwar is mors frequent Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED Z 1,.ANNUALLY ❑ 99.OTPIER(Specify): Mon. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and dere locations when monitoring is performed(Le-,location of each sonscr, <br /> Ime lak detector,monitoring system control panel,etc.). If you already have a diagram(a.&,current UST Monitoring Site Plan from a.Mcnitor ng System Certification <br /> form Hazardous Materials Business Plan map.etc.)which shows all required information include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING MERiOD(S):(Check all that apply) mto, <br /> lR 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITLAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: 0 a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mu. <br /> PANEL MANUFACTURER: VeederRoot m"' MODEL9: - M13. <br /> LEAKSENSORMANUFACPURER: VeederRDot MI', MODELH(S): 7943390-420 MIs, <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKS) <br /> PANEL MANUFACTURER MIs' MODELM M17, <br /> IN-TANK PROBE MANUFACTURER: MIA' MODEL*(S); MIR. <br /> LEAK TEST FREQUENCY: ❑ e.CONTINUOUS ❑ It,DAILYINTGHTLY ❑ c.WEEKLY M14a. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): MU. <br /> PROGRAMMED TESTS: ❑ a 0.1 g.p.h. ❑ b.0.2 g,p b. ❑ c,OTHER(Specify): Wz M13. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR 42646 ❑ It.STATISTICAL PER 23 CCR§2646.1 dao. <br /> 0 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR$2643 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS MIS. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ e.OTHER(Specify): MIS. M17, <br /> ❑ 6.VISUAL MONITORING HONE: ❑ a.DAILY ❑ It.WEEKLY(Rpva.q.a.y.ppm.,j) <br /> ❑ 99.OTHER(Specify): Mu. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Cbxk all that apply) MM• <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SYMENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a DRY ❑ b,LIQUID FILLED ❑ a UNDER PRESSURE ❑ d.UNDER VACUUM Not. <br /> PANEL MANUFACTURER:VeederRDot M3z• MODEL*! TI S.350 nfla. <br /> LEAK sENSoRMANUFACTURER: VeederRoot A64• MoDEL#(S): 794380-208 Mtl. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES O b.NO Mae' <br /> WILL FAILUP&DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ® b.NO M)r• <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MILD) THAT ROUTINELY PERFORMS 3.0 g.p.h, LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MILD MANUFACTURER(s): WA. MODEL#(S): M39. <br /> ❑ 3.ELECTRONIC LINE LEAK Dh I EC I OR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.b.LEAK TESTS <br /> FLLD MANUFACTURER; I Mao. MODEL q; M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINPAUM ANNUAL 0.1 g.p.h Merz. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mal. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHLPIDOWN?. ❑ a.YES ❑ b.NO M1c <br /> ❑ 4,INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY YEARS ❑ c.OTHER(Specify) Mas' Mse. <br /> ® S.VISUAL MONITORING DONE: ® A.DAILY Cl b.WEEKLY" ❑ c.MI1.MDNTHLY@ EACH T)MA 9Y3TEM OpwtATTo- wi <br /> •R�.s.y.W.'A "AII.W*d Rr m.ah9sat.t.Al W�mamei•,.Mcrhdprpmg°nIyp=HRC§232+15(b)W) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING 15 CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify)Rernatefill to UST 49=ity. Underground portion of piping is double wall. Mot' <br /> UN-022A-1l5 w .Imidomorg Rev.10/.14103 <br />