My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROLOD STORAGE TANK MOORING PLAN <br /> J For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Moi. <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. MW. <br /> (Check one item only) ® THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S):(1) 11gPd nil Tank <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ <br /> FACILITY NAME Stockto Service Center M03. <br /> FACILITY SITE ADDRESS 4 0 West Lane M04' CITY Stockton M05. <br /> II. AQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,prevent' maintenance,and calibration of monitoring equipment(e.g.,sensors,'probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufac rs'instructions,or annually,whichever is more frequent. Such.work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERV IC ® 1.ANNUALLY ❑. o9.OTHER(Specify): Mol <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan sh ing the general tank and piping layouts and t locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel, tc.). If you already have a diagram(e.g. orient UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map, <br /> etc. hwl shows all required information, elude it with this plan. <br /> IV. TANK MO TORING <br /> MONITORING IS PERFORMED USING THE FOLLO ING METHOD(S):(Che all that apply) Mlo. <br /> ® L CONTINUOUS ELECTRONIC MONITORING OF ANK ANNULAR(I�O�TERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ® a.D ❑ b.LI (IID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M''' <br /> PANEL MANUFACTURER: - r t M12. MODEL#: 350 M13. <br /> LEAK SENSOR MANUFACTURER: / erR M'4. MODEL#(s): 794390-420 M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED T NITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: Mu. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: MIR MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ aZ <br /> NUOU ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ dLY ❑ e.OTHER(Specify): M21_ <br /> PROGRAMMED TESTS: ❑ ah. ❑ b.0.2 .h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ aPER 23 CCR§264 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24❑ 4.WEEKLY MANUAL TANK GAUGING R 23 CCR§2645TESTING PERIOD: ❑ aRS ❑ b.60 HOURS M25❑ 5.INTEGRITY TESTING PER 23 CCR§26TEST FREQUENCY: ❑ aLLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27 <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a ❑ b.WEEKLY(Regni agency approvaq <br /> ❑ 99.OTHER(Specify): M29 <br /> V. PIPE MON1TOkWG <br /> MONITORING IS PERFORMED USING T FOLLOWING METHOD(S)(Check all that apply) Mao_ <br /> t� 1.CONTINZRAN <br /> S ELECTRONIC MO Ir <br /> OF PIPING SUMP(S)/TRENCH(ES)AND O ER SECONDARY CONTAINMENT <br /> SECARY CONTAINME IS: ® a.DRY ❑ b.LIQUID FILLED ❑ UNDER PRESSURE ❑ d.UNDER VACUUM MA. <br /> PANANUFACTURER a erRoot M MODEL#: 350 M3J' <br /> LEANSOR MANUF TURER: VeederRoot M34. MODEL#(s): 794380-208 M35, <br /> WILIPING LEAK ARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDO ❑ a.YES ® b.NO M36, <br /> WILILURE/DISC ECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC MP SHUTDOWN? ❑ a.YES N b.NO M3L <br /> ❑ 2.MECHAL LINE L AK DETECTOR (MELD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LE TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODULOW WH A LEAK IS DETECTED <br /> MELANUFA URER(s): Mae. MODEL (S): M39. <br /> ❑ 3.ELECTRC LIN EAK DETECTOR(FLED)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLN ACTURER: M40. MODEL#: M41. <br /> PROM ED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MIN UM ANNUAL 0.1 g.p.h. M42WILDETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43WILD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M444.INTEGRTESTINGTESEQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45, M46. <br /> 5.VISUALITORING DONE: ® a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME STEM OPERATED" MP/a rD�..rl ('ar*oM fiP' - •Requires agency approval "Allowed for monitoring of anburied emrgency grneeator"a 'ping only per HSC§2528L5(b)(3) <br /> 6.PIPING IION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2616(x) ) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ <br /> 99.OTHER(Specify)Remote foil to UST ity. Underground portion of piping is double wall. M48. <br /> UN-022A-1/5 www.unidocs.org Rev.10/14/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.