Laserfiche WebLink
Underground Storage Tank Monitorioan-Page 2 of 2 • <br /> used OIL t-a,4(_ <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSERS)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Myo. <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: M51. MODEL#: M32. <br /> LEAK SENSOR MANUFACTURER: M53_ MODEL#(S): i M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK LARM TRIGGER AUTOMATIC PUMP SHUTDOWN? - ❑ a.YES ❑ b.NO M56. <br /> WILL FAILURE/DIS ECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mn. <br /> ❑ 2.MECHANICAL ASSEMBLY g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTU R: Mss, MODEL#(S): M59. <br /> ❑ 3.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Regaires agency approvap MW. <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) Mbt. <br /> II. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STA WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK 'MV°. <br /> DETECTION(ELD)FOR l HE UST(S)COVE D BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. T INING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILI (Check all that ap y) Mso. <br /> L ® THIS UNDERGROUND STORAGE TANK MONI RING PLAN equired) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MO TORING E UIPMENT(Required) <br /> 3. ❑ THE FACILITY'S BEST MANAGEMENT PRACTIC (Requ' ed as of January 1,2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK UL IONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LA <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (S CB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TAN GAUG G FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): Msl. <br /> Personnel with UST monitoring responsibilities are familiar h all of the abov documents relevant to thenjob duties and can access those documents when needed. <br /> By January 1,2005,this facility will have a"Designated U Operator"who ha assed the California UST Sytem Operator Exam administered by the International <br /> Code Council(ICC). By July 1,2005,and annually there er,the "Designated U T Operator"will train facility employees in the proper operation and maintenance <br /> of the UST systems.This training will include,but is not mited to,the following: <br /> ➢ Operation of the UST systems in a manner consi ent with the facility's best man ement practices. <br /> ➢ The facility employee's role with regard to the ak detection equipment. <br /> ➢ The facility employee's role with regard to sp s and overfills. <br /> ➢ Whom to contact for emergencies and leak tection alarms. <br /> For facility employees hired on or after July I,20 5,the initial training will be conducted withi 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL FORMATION <br /> Please use this section to include any addition I UST system monitoring-related information(e.g.,ad tional information required by your local agency): Mss. <br /> Note regarding Section X.Pending certif tion of a Designated UST Operator,the following p rson has authority for performing the monitoring <br /> activities and maintaining leak detectio equipment covered by this plan. NAME:Michelle Le JOB TITLE: Env Specialist <br /> Overfill for this tank is an au ble/visual alarm set at 90%. Additionally, quanititie of less than 25 gallons are <br /> delivered into the tank at a one time. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF JANUARY 1, 2005, J HE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF TCURRENT UST OPERATING PERMIT <br /> APPLICATION— FACILITY ORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONI RING ACTIVITIES AND MAINTAINING <br /> LEAK DETECTION EQUIP ENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINI UM MONTHLY VISUAL INSPECTIONS <br /> OF THE FACILITY'S UST YSTEMS IN ACCORDANCE WITH 23 CCR§2715(b), <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: Ycerfify that the information provided herein is true and accurate to the best of my kn ledge. <br /> OWNERIOPERAT0 IGNATURE REPRESENTING DATE: M9L <br /> ❑Owner M9o. <br /> ❑Operator 9/24/07 <br /> OWNER/OPERATO AM_E(print): M92. OWNER/OPERATOR TITLE: M93, <br /> Michelle Le Environmental Specialist <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapprov <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> UN-022A-3/5 www.unidocs.org Rev.10/14/03 <br />