My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01-20—' 05 15:38 FROM— T-614 P011/014 F-545 <br /> •SWRCB, MAY 2002 • • Page 3 of <br /> 5. SECONDARY PIPE VESTING <br /> "fest Method Developed by: ❑ Piping Manufacturer �;industry Standard ❑ Professional Engineer <br /> Other(Specify) <br /> Test Method ❑ pressure Vacuum <br /> Hydrostatic <br /> Of (Specify) <br /> lter <br /> 'lest Equipment Used: PRESSURE GAUGE Equipment Resolution: �pyi <br /> Piping Run# Piping Run# Piping Run#3 Piping Run# <br /> Piping Material; <br /> Piping Manufacturer: ... �� 0 <br /> Piping Diameter: <br /> rYi H ib <br /> Length of Piping Run: d o <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure starting test: <br /> ris��r rr��s <br /> That Start Time: sr <br /> 3D r 0 36 <br /> Initial Reading(Ri) .s, 0 f e, fS 6 fos C <br /> TestEnd'ISme: Ad eve — <br /> Final Reading(R.): <br /> Test Duration: <br /> Change in Reading(Rv�Rx): O 6 O <br /> Pass/Fail Threshold or Criteria: <br /> TEST RESULTI is <br /> PASS � FAIT, ,C�PAss a FAIL PASS p WL Pass CP rAIL <br /> Comments—(include injorntatiat on repairs made prior to testing, and recontntended follq)v-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.