Laserfiche WebLink
01-20-'05 15: 38 FROM- • • T-614 P022/014 F-545 <br /> ovirtlun, ivttjr euuz Page`�_of�( <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed by: [J Sump Manufacturer 0 Industry Standard Q Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method ❑ Pressure L] Vacuum [�/Il�drostatic <br /> Other(Specify) <br /> Test Equipment Used: VMI Equipment Resolution: .05 gph <br /> Sump At Sump# Z, Sump# 0/0 Sump# <br /> Sump Diameter <br /> Sump Depth �r <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest piping Penetration: �'� '44- <br /> tN <br /> Height from Tank Tbp to Lowest <br /> Electrical-Penetration: <br /> Condition of sump prior to testing: vG pD <br /> Portion of Sump Tested: <br /> Does turbine shut down when sump <br /> sensor deems either product or water'? r — -- <br /> Turbine shutdown response time; r----- <br /> Is system programmed for _ <br /> fall-safe ShutdOWO? <br /> Was failsafe verified to be <br /> operational? <br /> Wail time between applying pressure/ <br /> vacuum/water&starting test; <br /> Test Start Time: /gyp c od e <br /> Initial Reading(R,) <br /> Test End Time: <br /> Final Reading(Rv): 7S�d✓/ / j/yy� <br /> Test Duration: <br /> Change in Reading(Rs-R,): <br /> Pass/Fail Threshold or Criteria: r �Of v q <br /> TEST RESUM, WPASS [] FAIL aPASS 0 FAITPASS 0 FAIL 0 PASS ❑ FAIL <br /> Was sensor removed for testing? (ayes 0 No 0 NA Yes r3 NO 0 NA Yes 0 No 0 NA I C1 Yes[]No 0 NA <br /> Was sensor properly replaced& <br /> verified functional after testing? ?Yes 0 No 0 NA �Yes 0 No C]NA q'lles L]No[]NA 0 Yes 0 No 0 NA <br /> Comments-(include information on repairs made prior to testing and reconnuended follow-up for failed tests) <br />