Laserfiche WebLink
01-20-'05 15;39 FRONI- <br /> S1NRGU� MAY 2002 • T-614 P014/014 F-545 <br /> 9. SPILL/ OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes[] <br /> Spill/Overfill Containment Boxes are Present,But Were Not TeSted [] professional Engineer <br /> Test Method Developed by: [] Spill Bucket Manufacturer Q Industry Standard <br /> Other(Specify) <br /> Test method, Pressure <br /> Cl Vacuum J�ydrostatic <br /> Q Other(Specify) <br /> Test Equipment Used: �/ r Y^c N Equipment Resolution: '05 V, <br /> dier•cP' 0/o <br /> Spill Box# SpiU Box# <br /> Spill sox# 'P > SpillSpillBox tt�, 3 <br /> s D ' <br /> Bucket Diameter- <br /> Bucket Dcpth: <br /> � w <br /> Weight time between applying �} <br /> pressure/vaeuumJwater&start test: <br /> Test Start Time: EPJdO ,'do <br /> luitial Reading(RI) <br /> 'Test End Time: <br /> Final Reading(R�): �Oor+ Si� d <br /> Test Duration: ams r JZ�s d rr <br /> Change in Reading(Rv-1L): G•� �' <br /> < as � <br /> pass/nail Threshold or Criteria: fJ f tidy tot R Q FAIL Q PASS Q FAIL <br /> TEST RESULT` PASS Q TAIL [�PASS Q ATL PASS <br /> Coinments (include information on repairs made prior to testing, and reco+n+nwrded follow-up for tted tests) <br /> fa <br />