Laserfiche WebLink
01-20-' 05 15;39 FROM- T-614 P013/024 F-545 <br /> 'SWRCB, MAY 2002 • • Page 5 of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed by: UDC Manufacturer 0 Industry Standard professional Engineer <br /> 0 Qther(S}pecify) <br /> Test Method Developed by: © Pressure 0 vacuum ydrostatic <br /> Other(Specify) <br /> Test Equipment Used: VN Equipment Resolution: .05 gph <br /> UDC# peg UDC# - m UDC# -5 <br /> UDC Manufacturer: <br /> UDC Materials: v <br /> UDC Depth: 3 <br /> Height from UDC Bottom to Top <br /> Of Highest Piping Penetration: 2 gr <br /> Height from UDC Bottom to <br /> Lowest Electrical-Penetration: 2 <br /> Condition of UDC prior to testing: <br /> Portion of UDC'rested: ALL ALL ALL ALL <br /> Does tutbine shut down when UDC <br /> sensor detects either product or water? <br /> Turbine shutdown response time: <br /> Is system programmed for <br /> fail-safe shutdown? 4 <br /> Was fail-sate verified to be <br /> operational? <br /> Wait time between applying pressure/ <br /> vacuum/water a starling test: , J 7lra <br /> Test Start Time: <br /> o cs <br /> Initial Reading(R,) <br /> Test End Time: <br /> Final Reading(Re): <br /> Test Duration: <br /> ��» <br /> Change in Reading(RB-R.): .+r/ <br /> +a <br /> Pass/Fail Threshold or Criteria: r OS G1 t os9�� ♦ a1�/�y <br /> xm 'sDx7` rAss C3 rArr OrrAss xAlL rASS FAIL PASS FAIL <br /> Was sensor removed for testing? Yes 0 No[I NA es❑No❑NA es 0 No(]NA O Yes f]No fj NA <br /> Was sensor properly replaced& <br /> verged functional after testing? l Yes Q No[j NA (�Yes[I No 0 NA Yes Q No[]NA 0 Yes 0 No 0 NA <br /> COIr MCntS--(include it(formaIion on repairs inade prior to testing, and recon inteuded follow-up for failed rests) <br />