My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.7/15/2008 16:35 FAX 510 614 8596 PARADISO MECHANICAL 1&007 <br /> T <br /> James H. Ray <br /> CIVIL ENGINEER <br /> 2041 Hidden Valley Drive <br /> Santa Rose.CA 95404 <br /> 707480-8115 <br /> April 21,2008 <br /> Western Fiberglass. Inc. <br /> 1555 Copper Hill Parkway <br /> Santa Rosa,CA 95403 <br /> RE= UNDER-DISPENSER SPILL CONTAINMENT OR CONTROL SYSTEM <br /> WESTERN FIBERGLASS <br /> UDC TRANSITION CONTAINMENT FRAME I <br /> FIBERGLASS VERSION AND FLEXIBLE VERSION <br /> 12EVIEW BY STATE REGISTERED PROFESSIONAL ENGINEER <br /> This System is designed to maintain the integrity of the existing wider dispenser <br /> containment structure when a replacement larger dispenser is installed over an existing <br /> small dispenser containment sump. <br /> I have examined and reviewed the following items and material: <br /> 1. Examined the Fiberglass Version of the UDC Transition Containment Frame. <br /> 2. Examined the Flexible Version of the UDC Transition Containment Frame, <br /> 3_ Reviewed a copy of the Document Review List submitted to SWRCS for the <br /> fiberglass Item 1 <br /> 4. Reviewed a copy of the Document Review List submitted to S WRCB for Item 2 j <br /> including Petro Gard VI Chemical Compatibility Chart and Performance <br /> Sped£cation. <br /> 5. Field Installation Manual <br /> 6. Maintenance Guidelines <br /> I <br /> Upon review of the materials and construction it is my opinion and conclusion that sound <br /> engineering and design of the products allow for the replacement of an existing dispenser <br /> leaving the existing under-dispenser containment in place. <br /> /v /V Q0.�FES9/ppl. <br /> �PaEs H, <br /> � I <br /> I <br /> lames H_ Ray <br /> Civil Engineer ED/.�.3%•O% <br /> C VIL yri <br /> OF m <br />
The URL can be used to link to this page
Your browser does not support the video tag.